Laserfiche WebLink
C&W#256619 <br />5. Include new building grounding, lightning protection, exterior and interior lighting, <br />and receptacles, HVAC for the new building equipment room(s). <br />6. Design for new pump VFD controls schematics to interface with field instruments <br />and PLC controls. <br />7. The Generator will be sized based on the new pump station motor loads, <br />building, and a 100A feeder to the existing building so the Owner may use the <br />building facilities during power outages. <br />8. Coordination with the Electrical Utility if needed, depending on size of overall <br />service needed. <br />9. Include instrumentation and control equipment for the pump operation including <br />field instruments per PID, as designed by Kimley Horn. We will add <br />instrumentation mounting details and other signal termination details as needed <br />to match the requirements of the installation. <br />10. Provide new radio telemetry from new equipment room to provide all PLC 1/0 via <br />radio telemetry back to plant SCADA system.. <br />11. PLC panel we will include a flat panel HMI SCADA screen to display status of <br />pumps, process, and instruments along with historical information. <br />12. Submit documents for review and comment at the 60%, 90%, and final bid <br />document completion levels. The Submittal will include drawings, specifications, <br />and an opinion of costs. <br />13. We will attend submittal review meetings at 60% and 90% and implement the <br />Owner recommendations/comments into the design documents. <br />14. Include services for permitting. <br />15. Include services during the bid cycle. <br />16. Services during construction are EXCLUDED. <br />ENGINEERING DESIGN SERVICES <br />Coordination <br />Kimley Horn <br />Owner <br />