My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-208
CBCC
>
Official Documents
>
2020's
>
2025
>
2025-208
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2025 2:55:51 PM
Creation date
10/21/2025 2:55:08 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
09/23/2025
Control Number
2025-208
Agenda Item Number
9.X.
Entity Name
Kimley-Horn and Associates, Inc
Subject
Engineering Services Work Order 21 for the Wabasso Repump Station Conversion
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C&W#256619 <br />5. Include new building grounding, lightning protection, exterior and interior lighting, <br />and receptacles, HVAC for the new building equipment room(s). <br />6. Design for new pump VFD controls schematics to interface with field instruments <br />and PLC controls. <br />7. The Generator will be sized based on the new pump station motor loads, <br />building, and a 100A feeder to the existing building so the Owner may use the <br />building facilities during power outages. <br />8. Coordination with the Electrical Utility if needed, depending on size of overall <br />service needed. <br />9. Include instrumentation and control equipment for the pump operation including <br />field instruments per PID, as designed by Kimley Horn. We will add <br />instrumentation mounting details and other signal termination details as needed <br />to match the requirements of the installation. <br />10. Provide new radio telemetry from new equipment room to provide all PLC 1/0 via <br />radio telemetry back to plant SCADA system.. <br />11. PLC panel we will include a flat panel HMI SCADA screen to display status of <br />pumps, process, and instruments along with historical information. <br />12. Submit documents for review and comment at the 60%, 90%, and final bid <br />document completion levels. The Submittal will include drawings, specifications, <br />and an opinion of costs. <br />13. We will attend submittal review meetings at 60% and 90% and implement the <br />Owner recommendations/comments into the design documents. <br />14. Include services for permitting. <br />15. Include services during the bid cycle. <br />16. Services during construction are EXCLUDED. <br />ENGINEERING DESIGN SERVICES <br />Coordination <br />Kimley Horn <br />Owner <br />
The URL can be used to link to this page
Your browser does not support the video tag.