My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-208
CBCC
>
Official Documents
>
2020's
>
2025
>
2025-208
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2025 2:55:51 PM
Creation date
10/21/2025 2:55:08 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
09/23/2025
Control Number
2025-208
Agenda Item Number
9.X.
Entity Name
Kimley-Horn and Associates, Inc
Subject
Engineering Services Work Order 21 for the Wabasso Repump Station Conversion
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C & W engineering Inc. <br />Consulting Engineers — Electrical • HVAC • Plumbing <br />6903 Vista Parkway North, #10 <br />West Palm Beach, FL 33411 <br />(561) 642-5333 <br />August 27, 2025 <br />Nick Black, P.E. <br />Kimley Horn & Associates, Inc. <br />1920 Wekiva Way, Suite 200 <br />West Palm Beach, FL 33411 <br />Subject: Wabasso Water Reclamation Facility Master Inline Pump Station <br />Mechanical HVAC and Electrical Engineering Proposal <br />C&W Ref. 256619 <br />Dear Nick: <br />I am pleased to submit this proposal for your consideration to provide a <br />Preliminary Design Report or PDR, and design services to include Electrical, <br />Instrumentation and Controls Engineering, and Mechanical HVAC Design services for <br />the above referenced project. The work will include: <br />Provide site investigation phase where a Preliminary Design Report (PDR) is <br />provided based on the assessment of the current conditions and planned <br />improvements, including details on the equipment improvements and an opinion <br />of construction costs. Include new 480v electrical service with new main <br />disconnect, ATS switch, and outdoor generator. <br />2. A New 480V distribution panel and VFD equipment for the proposed triplex 60HP <br />in-line booster pumps. Third pump is a future pump. Control panel with VFDs and <br />PLC controls will be designed. <br />3. Equipment will be housed in a new equipment building (approximately 1500 SQ <br />FT with HVAC. The HVAC design will include energy calculations, duct work <br />design and mechanical details as required for permit and construction. <br />4. New control panel with PLC located in the new building to collect all VFD and <br />local equipment signals including the new inline booster pump station field <br />instruments such as pressure and flow. <br />
The URL can be used to link to this page
Your browser does not support the video tag.