My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08/12/2025 (2)
CBCC
>
Meetings
>
2020's
>
2025
>
08/12/2025 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2025 12:16:12 PM
Creation date
10/23/2025 11:43:54 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Special Call Meeting
Document Type
Agenda Packet
Meeting Date
08/12/2025
Meeting Body
Board of County Commissioners
Subject
2025 Indian River County Comprehensive Plan Evaluation and Appraisal Report (EAR) based Amendments
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Policy 4.9: By 2013, <br />{ALVl RJVLil[�[ <br />a to provide ineentives to steo s for- <br />water, The Utilities Department <br />VAVVJJl YV YY <br />will regularly review rate structures and adjust rates as necessary to further discourage water use and to <br />provide incentives for water savings. <br />NEW Policy 4.11: The County shall continue to implement the Water Conservation Plan associated with <br />its consumptive use permit. [Recommendation by SJRWMD] <br />Objective 5: Thefeugh the time hefizen ef the plan, the eeufAy will have eanapleted all pr-egammed <br />capital improvements shey in The County will continue to address the programmed capital <br />improvements shown in Appendix "A" of the Potable Water Sub -Element in or -del to maximize the use <br />of existing facilities and diseettfage ufban spfawl-. <br />Polis 5.1: in confo--.ne- with the t :: for- the Capital Tmpr-e YV1V1AJ Element of thispl <br />, <br />tThe eCounty shall maintain a five-year schedule of capital improvement needs for public facilities. <br />..R IM <br />Ism <br />- Level Thfee whether the pfoject fepr-esepAs a logical extension of f4eilities and sen,ices withi <br />[Addressed in other County documents/standards] <br />Policy 5.3: , the eoutAy Is <br />take the felleAI steps! <br />is- <br />pr-ejeeted too al o a it,.;ty w year -s; <br />thi 5 <br />e oos <br />- prepare plans and speeifieations fer- eyrpansien when a plant's Aver -age Daily Demand is pr-ejeeted te <br />equal n a itt.. thin it <br />exceed s n e w years; <br />Pr-eteetien fer- expeAisien when a plaftt's Avefage Daily Demand is pfejeeted te equal of exeeed <br />eapaoity within —3 years; and <br />Daily Demand ; pr-qjeeted too al o ueed its e e ty within 6 months. <br />The County shall continue to monitor and evaluate average daily demands at water treatment facilities <br />and plan for necessary improvements and expansions to deliver water at the committed Level of Service <br />in accordance with FDEP requirements. <br />Objective 6: , <br />`x'^to~ Plant f ilu fes of b feak. eyffis Privately -owned water treatment plants and systems shall operate <br />within County, state, and federal regulatory requirements. <br />C:\Users\ufc-prod\AppData\Local\Temp\BCL Technologies\easyPDF 8\@BCL@6414E534\@BCL@6414E534.docx 24 <br />ill <br />
The URL can be used to link to this page
Your browser does not support the video tag.