My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08/12/2025 (2)
CBCC
>
Meetings
>
2020's
>
2025
>
08/12/2025 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2025 12:16:12 PM
Creation date
10/23/2025 11:43:54 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Special Call Meeting
Document Type
Agenda Packet
Meeting Date
08/12/2025
Meeting Body
Board of County Commissioners
Subject
2025 Indian River County Comprehensive Plan Evaluation and Appraisal Report (EAR) based Amendments
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Solid Waste Sub -Element <br />Indian River County's third major Element is comprised of five (5) sub -elements, which altogether are <br />commonly referred to as an Infrastructure Element. The purpose of the Infrastructure Element is to <br />ensure the availability of wastewater, potable water, solid waste, natural groundwater, and stormwater <br />facilities to meet the existing and projected demands within the County. The Infrastructure Element <br />establishes level of service standards and aims to effectively manage growth and maintain environmental <br />quality while providing safe and adequate facilities for residents and visitors. The third sub -element of <br />the Infrastructure Element is the Solid Waste sub -element. <br />A summary of the changes that are proposed for the Solid Waste Sub -Element are as follows: <br />0 Avoid definitive determinations, such as the use of "always" in Objective 1 <br />0 Confirm and update the status of anticipated facilities, such as the Biosolids Facility <br />0 Continue to emphasize recycling and educate the public to reduce the amount of solid waste <br />0 Revised the Level of Service to 1.4 tons per equivalent residential unit per year. <br />These recommended changes are important to improve this Element which protects the citizens, as well <br />as the built and natural environment in the County. <br />Objective 1: Through the time horizon of the plan, the active segment of the landfill will always have <br />sufficient capacity to accommodate demand. <br />Policy 1.1: Design for additional disposal cellsegments- of the landfill shall be completed before the <br />active cellsegment of the landfill is at -750% of its capacity, and construction of additional cellsegmexts <br />shall begin when the active cellsegment is at 7560% of its capacity in order to ensure that the established <br />level of service will be maintained. The current projected capacity and/or lifespan of Segment 3 Cells 1- <br />8 is through the year 2074. This lifespan is contingent upon rigorous recycling and recycling education <br />as well as the unknown factors of population growth and economics. <br />Policy 1.2: New development within the Indian River County Solid Waste Disposal District fSWDD) <br />service area shall continue to be approved only when capacity is available at the active cellsegment of <br />the landfill. If the active cellsegment of the landfill is at 980% of its capacity and a new segment is not <br />ready, additional development shall not be permitted. <br />Policy 1.3: The following level of service standards are hereby adopted, and shall be used as the basis <br />for determining the availability of facility capacity and the demand generated by new development: <br />21.4 tons per eapita equivalent residential unit. for- ^ ent population plus weighted sease <br />population per- year- of 4 etibie yards per- pennanepA population plus wei&ed seasonal population per - <br />Policy 1.5: The SWDD shall maintain a comprehensive solid waste management master plan and shall <br />prepare annual summaries of demand and capacity information for the active segment of the landfill. <br />All future expansion of the landfill and the SWDD facilities shall be consistent with the adopted solid <br />waste level of service standards. <br />C:\Users\ufc-prod\AppData\Local\Temp\BCL Technologies\easyMF 8\@BCL@6414E534\@13CL@6414E534.docx 27 <br />33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.