My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-213A
CBCC
>
Official Documents
>
2020's
>
2025
>
2025-213A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2025 12:03:37 PM
Creation date
11/3/2025 11:56:38 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
10/07/2025
Control Number
2025-213A
Agenda Item Number
9.G.
Entity Name
Kimley-Horn & Associates, Inc.
Subject
Work Order 22 for Facilities Electrical Improvements and Standby Power
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C&W Ref. 256618 <br />• Task 2 — Draft Review for Utility Facility Lightning Protection Evaluation <br />• Task 3 — Review Meeting for UFA Wellfield Standby Emergency Power Alternatives <br />Analysis Draft <br />• Task 4 — Review Meeting for UFA Wellfield Condition Assessment and Evaluation Draft. <br />As part of this coordination effort, we will also work with a selected electrical contractor to <br />perform facility grounding tests. Our estimated engineering fees for services associated with <br />these tasks are presented below. <br />Engineering Fees: <br />Field visits to 11 facilities evaluation for task 1,2,3,4: <br />$10,000.00 <br />lump sum <br />Task 1: Prepare Due Diligence evaluation: <br />$ 8,000.00 <br />lump sum <br />Task 2: Facilities Lightning/Grounding & Testing: <br />$20,000.00 <br />lump sum <br />Task 3: Wellfield Emergency Power Analysis: <br />$ 7,000.00 <br />lump sum <br />Task 4: Wellfield Emergency Power Analysis: <br />$ 7,000.00 <br />lump sum <br />Task 5: Meetings and Coordination: <br />$ 6,000.00 <br />lump sum <br />Total Fee: <br />$58,000.00 <br />lump sum <br />I trust the above scope is in agreement with your needs and expectations. If you <br />have questions or comments regarding the above, please feel free to call. <br />Very truly yours, <br />C & W Engineering Inc. <br />Michael Guida, P.E. <br />JLR/nl <br />File <br />
The URL can be used to link to this page
Your browser does not support the video tag.