My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-213A
CBCC
>
Official Documents
>
2020's
>
2025
>
2025-213A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2025 12:03:37 PM
Creation date
11/3/2025 11:56:38 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
10/07/2025
Control Number
2025-213A
Agenda Item Number
9.G.
Entity Name
Kimley-Horn & Associates, Inc.
Subject
Work Order 22 for Facilities Electrical Improvements and Standby Power
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Consultant will submit alternatives analysis technical memorandum as draft to IRCDUS. Based on the <br />alternatives analysis, feedback from staff, an option will be selected for each WTP for future <br />implementation. This recommendation will be included in the final technical memorandum submittal. <br />Task 4 —Water Plant Wellfield Condition Assessment <br />Consultant will review site conditions for each of the nine (9) wells in at Hobart. Consultant will prepare <br />a list of recommended improvements based on site observations. <br />Consultant will update Hobart Wellfield Evaluation Report previously prepared by others. Consultant <br />will update report based on other disciplinary observations (civil, mechanical/process, instrumentation) <br />needing improvements or enhancement. <br />Consultant will create a matrix to prioritize the improvements. The matrix will be in a tabulated format <br />and be utilized to calculate and assign a priority level to each individual item. Prioritization will be based <br />on the primary objectives that include, but are not limited to improvements for regulatory compliance, <br />reliability, efficiency and resilience. The matrix will include the following criteria: <br />• Criticality to treatment/water quality <br />• Criticality to high service pumping <br />• Impacts to treatment <br />• Impacts to operation <br />• Impacts to maintenance <br />• Intangibles <br />• Capital Costs <br />Consultant will compile the recommended wellfield improvements with the Oslo wellfield improvements <br />outlined in Work Order #17 Oslo WTP Capital Upgrades and Renewals. All capital OPCCs will be <br />Class 5 as defined by the Association for the Advancement of Cost Engineering (AACE). <br />Consultant will provide Water Plant Wellfield Condition Assessment Technical Memorandum as draft to <br />IRCDUS. Consultant will implement IRCDUS review comments and finalize submittal. <br />Task 5 — Project Management and Meetings <br />Consultant will provide coordination for the duration of the project design, including plan review and <br />design review meeting attendance, design progress meetings, and status meetings during the progress of <br />the project. It is anticipated that approximately four (4) meetings will be held and attended by Consultant. <br />Consultant will prepare minutes from each meeting and distribute to the project team. The following <br />meetings are anticipated: <br />• Pre -work meeting <br />• Task 2 — Utility Facility Lightning Protection Evaluation Draft Review Meeting <br />• Task 3 — UFA Wellfield Standby Emergency Power Alternatives Analysis Review Meeting <br />• Task 4 — UFA Wellfield Condition Assessment and Evaluation Review Meeting <br />Consultant will also provide project management for the project, consisting of coordination, planning and <br />scheduling of project tasks and deliverables, meeting attendance, coordination of staffing on project, <br />coordination with subconsultants, administrative work including filing of all documentation, meeting <br />minutes, letters, etc. The Consultant will provide a status report with each invoice for each period covered <br />by the invoice. The report will provide accomplishments for each task in the SOW and status of the <br />schedule including plan versus actual. A forecast to complete date will be provided. It is estimated that <br />approximately twenty (25) hours of administration time and fifteen (20) hours of professional time will be <br />required for this task. <br />K:\WPB_Civil\Geneml\Black\Florida\IRCU\Water Facility Electrical Enhancements\20250904 - Water Facility Electrical Improvement <br />Scope.doc Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.