My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-213A
CBCC
>
Official Documents
>
2020's
>
2025
>
2025-213A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2025 12:03:37 PM
Creation date
11/3/2025 11:56:38 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
10/07/2025
Control Number
2025-213A
Agenda Item Number
9.G.
Entity Name
Kimley-Horn & Associates, Inc.
Subject
Work Order 22 for Facilities Electrical Improvements and Standby Power
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Roseland Elevated Storage and Repump Facility <br />• Gifford Wastewater Treatment Facility <br />• South Wastewater Treatment Facility <br />• West Wastewater Treatment Facility <br />• Residuals Dewatering Facility (Landfill) <br />• 77`' Avenue Repump Station <br />• 77`x' Avenue Reclaim Water Pump Station <br />Consultant will document the findings from the site investigations. <br />Task 2 - Facility Lightning Protection & Grounding Evaluation <br />Consultant will utilize the information collected during the site visits to prepare a test plan document that <br />outlines testing needed to determine condition of lightning protection that cannot be known through <br />visual observations. Consultant will furnish test plan to Owner. <br />Consultant will coordinate with electrical contractors to obtain pricing to perform the grounding testing. <br />Consultant will provide proposals received to IRCDUS for procurement. Consultant's proposal does not <br />include electrical testing. <br />Consultant will accompany IRCDUS-selected contractor in the field to review and collect data from the <br />testing and investigation. Consultant assumes up to five (5) days of field testing will be necessary. <br />Consultant will collect the data from field testing and photographs of existing equipment and combined <br />with the findings of testing, prepare a technical memorandum that outlines the necessary lightning <br />protection measures to be implemented at each of the eleven (11) facilities. Consultant will submit tech <br />memo as a draft to Owner for review and comment. Consultant will implement changes to document <br />based on Owner feedback and submit document as final. <br />Task 3 — Wellfield Emergency Standby Power Alternatives Analysis <br />Consultant will prepare an alternatives analysis to provide backup power to all the well sites for Oslo <br />WTP. The alternatives will consist of the following: <br />1. Centralized Emergency Generator at South County Park to serve S-5, S-6, and S-7 <br />2. Standalone generator at S-5, S-6 and S-7 well sites <br />3. Additional Generator at Oslo WTP and conduit and conductors from the WTP to each well site <br />a. This alternative will include option to remove standalone generator at S -4R <br />Consultant will prepare an alternatives analysis to provide backup power to all the well sites for Hobart <br />WTP. The alternatives will consist of the following: <br />1. Centralized Generator for wells N-7 and N-9 and future well sites <br />2. Standalone generators at N-7 and N-9 well sites <br />3. Power service from WTP to backup the separate FPL service <br />Consultant will quantify the limitations of the existing WTP emergency generators to provide the <br />necessary backup power for Oslo and Hobart Options #3. Where necessary, improvements to enhance <br />WTP backup power will be presented. <br />Consultant will prepare preliminary sketches that display the necessary infrastructure improvements to <br />facilitate each alternative. Sketches will depict conduit sizing and alignment, building/room floor plans, <br />and one -line diagrams. Consultant will prepare an Opinion of Probable Construction Cost (OPCC) <br />associated with the necessary improvements. OPCCs will be Class 5 as defined by the Association for <br />the Advancement of Cost Engineering (AACE). Consultant will prepare an overview of the proposed <br />alternative with associated advantages and disadvantages for IRCDUS consideration. <br />K:\WPB_Civil\General\Black\Florida\IRCU\Water Facility Electrical Enhancements\20250904 - Water Facility Electrical Improvement <br />Scope.doc Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.