Laserfiche WebLink
Objective 2: For the period from 2009 to 2030, crash and fatality rates per vehicle mile traveled will be <br /> reduced at-least-by by at least 1% each year across the five previous year rolling average. The County <br /> shall incorporate FDOT "Target Zero"principles in the design of transportation facilities. <br /> Objective 3: By 203510,the eCounty will have-aequiredseek to acquire the right-of-way needed for all <br /> county collector and arterial roads and all mass transit corridors within the urban area where <br /> improvements are identified in the 20405 Cost Feasible Long Range Transportation Plan. <br /> Objective 4: Through 20305, 80%percent of roadways in Indian River County will operate at Bicycle <br /> and Pedestrian Level of Traffic Stress 3 or better. Bike/Ped LOS "D" or above. <br /> Policy 4.1: The eCounty hereby adopts the MPO Bicycle/Pedestrian Plan. Implementation of the plan in <br /> the unincorporated county will occur through the incorporation of improvements identified in that plan <br /> in its TCIP. The plan will be used as a basis for applying for and programming federal enhancement <br /> project funds. Funds will be used to program improvements such as the construction of new bicycle and <br /> pedestrian lanes and paths, and the retrofit of existing lanes and paths. The implementation schedule <br /> will be determined by the priority ranking of each roadway segment as contained in the MPO <br /> Bicycle/Pedestrian Plan. The following programs shall also be implemented by the county according to <br /> the plan:an off-road facilities program,a safety improvement program,and a mode shift program. These <br /> programs will be implemented as the funding, right-of-way, or other necessary resources become <br /> available. The Plan shall be updated every 5 years and shall include a summary of bicycle and pedestrian <br /> improvements that have been implemented since the previous update. <br /> Policy 4.2: By 202028,the eCounty shall evaluate utility easements,railroad rights-of-way and drainage <br /> canal rights-of-way as locations for off road trails. This evaluation will be based upon safety and cost <br /> considerations as well as negotiations with appropriate agencies which control these easements and <br /> rights-of-way. <br /> Policy 4.8: The eCounty will install bike-ped signals at all new signalized intersections and will install <br /> Objective 6: By 204428, the eCounty will have a system which ensures that all transportation <br /> requirements, procedures, and improvements are coordinated with all applicable governmental entities <br /> and will have entered into two new formal coordination agreements with adjacent local governments. <br /> This coordination shall continue through the time horizon of this plan. <br /> Policy 6.4: The eCounty will coordinate with CareerSource , the Sebastian-and-Vera <br /> Beate Chambers of Commerce, local businesses, other MPOs and FDOT to develop regional TDM <br /> programs. The county will participate in Regional Transit Authority activities with other Treasure Coast <br /> T/MPOs and the Space Coast TPO. The county will coordinate with FDOT and the Florida East Coast <br /> Railroad(FEC) on future passenger rail service. <br /> Objective 7: Through 203045, the eCounty's transit system will continue to operate at or above the <br /> minimum service level specified in policy 1.1. <br /> Policy 7.3: The eCounty shall hereby adopts the MPO's Transit Development Plan as amended by the <br /> MPO. <br /> C:\Granicus\Legistar5\L5\Temp\9ec5cab0-071 a-4938-8838-22e53bcab073.docx 41 <br /> 251 <br />