My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/09/2025
CBCC
>
Meetings
>
2020's
>
2025
>
09/09/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2025 12:13:04 PM
Creation date
11/7/2025 11:01:37 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
09/09/2025
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
529
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Capital Improvements Element: <br /> The Capital Improvements Element ensures the fiscal capability of the County to fund needed public <br /> facilities, guides the funding of those identified improvements, and schedules the funding and <br /> construction of improvements in a manner necessary to ensure that capital improvements are provided <br /> when required. The Capital Improvements Element is updated annually, so few changes are expected to <br /> be necessary. A summary of the changes is as follows: <br /> 0 Update Planning Horizon and agency references, e.g., the Florida Department of Economic <br /> Opportunity(DEO)recently rebranded to Florida Commerce <br /> 0 Duplicative policies (between the Capital Improvements Element and other Elements) were <br /> identified,but it was noted that these may be kept without issue for ease of reference <br /> These proposed amendments are minor in nature but would improve the accuracy of the Element, <br /> ensuring it can be implemented appropriately. A capital improvements plan is a necessary tool in <br /> implementing the Comprehensive Plan as a whole, and this will ensure the needs of the community will <br /> continue to be addressed and met. <br /> Policy 1.2: The eCounty and the School District shall undertake only those capital improvements <br /> included within this element's adopted capital improvements program. Pursuant to Section <br /> 163.3177(3)(b) F.S., the Capital Improvements Element will be reviewed every year. If any facility <br /> identified in the Schedule of Capital Improvements is delayed or deferred in construction, or is <br /> eliminated from the capital improvements program, and this delay, deferral, or elimination will cause <br /> the level-of-service to deteriorate below the adopted minimum level of service standard for the facility, <br /> a comprehensive plan amendment will be required to adjust the Schedule of Capital Improvements. The <br /> annual update of the capital improvement element shall be done with a single public hearing before the <br /> Board of County Commissioners and a copy of the ordinance amending the Capital Improvements <br /> Element shall be transmitted to DEOthe state land planning agency. <br /> Objective 2: Through 204538, development in coastal high hazard areas will not increase beyond the <br /> density or intensity levels indicated on the current Future Land Use Map. <br /> Policy 2.1: The coastal high hazard area is defined as the area of the county designated as evacuation <br /> zones for a category one hurricane. <br /> Objective 3: Through 204538, adopted levels-of-service will be maintained for all concurrency <br /> facilities. <br /> Objective 4: Through 204538,new developments will bear a proportionate share of the cost required to <br /> maintain adopted level-of-service standards. <br /> Objective 5: Through 204538, the eCounty will ensure that it is able to fund and provide required <br /> services and facilities. <br /> C:\Granicus\Legistar5\L5\Temp\9ec5cab0-071a-4938-8838-22e53bcab073.docx 45 <br /> 255 <br />
The URL can be used to link to this page
Your browser does not support the video tag.