Laserfiche WebLink
1.4.1.2 Providing more extensive programmatic criteria than that furnished by the Owner as <br />described in Paragraph 2.1 and other Contract Documents. <br />1.4.1.3 Providing such other design -build services that may be required for the successful <br />completion of the Project not otherwise covered herein. <br />1.4.1.4 If, during the performance of the Work, Design -Builder discovers any conflict, error, <br />ambiguity, or discrepancy within the Contract Documents or between the Contract Documents <br />and any provision of any Law or Regulation applicable to the performance of the Work or of any <br />standard, specification, manual or code, or of any instruction of any Supplier, Design -Builder <br />shall report it to Owner in writing at once. Design -Builder shall not proceed with the Work <br />affected until an amendment or supplement to the Contract Documents has been executed by <br />both parties; provided, however, that Design -Builder shall not be liable to Owner for failure to <br />report any such conflict, error, ambiguity, or discrepancy unless Design -Builder knew or reason- <br />ably should have known of such conflict, error , ambiguity or discrepancy. <br />ARTICLE 2 <br />OWNER <br />2.1 RESPONSIBILITIES <br />2.1.1 The Owner is the entity identified as such in this Contract and is referred to throughout <br />the Contract Documents as if singular in number. <br />2.1.2 This Contract will be administered by the Owner's County Administrator or designee. <br />2.1.3 The Owner will provide full information in a timely manner, as requested by Design - <br />Builder, regarding requirements for the Project, including a written plan which will set forth the <br />Owner's objectives, schedule, constraints and criteria. The Owner will designate a <br />representative Project Manager, authorized to act on the Owner's behalf with respect to the <br />Project. The term "Owner" means Owner or Owner's other authorized representative(s) as <br />notified by the Owner in writing. <br />2.1.4 The Owner will establish and update an overall budget for the Project, including <br />reasonable contingencies. This budget will not constitute the Contract sum. <br />2.1.5 The Owner will render decisions pertaining to Project Documents submitted by the <br />Design -Builder in a timely manner in order to avoid unreasonable delay in the orderly and <br />sequential progress of the Design -Builder's services. The Owner may obtain independent <br />review of the Project Documents by a separate architect, engineer, contractor, or cost estimator <br />under contract to or employed by the Owner. Such independent review will be undertaken at the <br />Owner's expense in a timely manner so as not to unreasonably delay the orderly progress of the <br />Design -Builder's services. Design -Builder will ensure Owner is provided reasonably adequate <br />time that permits Owner to render its decisions and conduct independent reviews of Project <br />Documents in a timely manner. <br />2.1.6 Upon written request, the Owner will make available record documents and drawings in <br />its possession, of which it is aware, for any existing buildings and/or facilities. To the extent <br />known and in its possession, Owner will make available to the Design -Builder prior to and <br />during the performance of the Work record documents and Drawings pertaining to the existing <br />buildings and/or facilities relative to this Project. Record documents and Drawings will not be <br />Ixora Park Infrastructure Improvements 5 <br />