Laserfiche WebLink
In an ongoing effort to continue expansion of the Sebastian service <br />area utilities, and in compliance with the interlocal agreement <br />between the City of Sebastian and Indian River County, both the <br />County and City staff have identified the need for water service to <br />be provided to Louisiana Avenue (between CR 512 and Main Street) in <br />Sebastian. This need is being driven by a request from the City of <br />Sebastian to provide service to "Grace's Landing," a proposed 70 - <br />unit assisted living housing project at the corner of Louisiana <br />Avenue and Palmetto Avenue in the City of Sebastian. (See attached <br />letters from developer's engineer and the City of Sebastian.) <br />Water service will be provided by the County through an assessment. <br />The developer will extend sewer service from Main Street. <br />The extension of said water and sewer lines will be in conformance <br />with the Comprehensive Plan for the City of Sebastian and <br />constitutes no violation of any City goal or objective of the <br />City's Comprehensive Plan and, therefore, would be in compliance <br />with the Plan. The City of Sebastian supports the extension of <br />both the water and sewer lines. <br />On July 9, 1996, the Board of County Commissioners of Indian River <br />County adopted Ordinance No. 96-13, which created the Sebastian <br />Area MSBU for Water and Sewer Line Extensions. <br />ANALYSIS <br />Fifty-five properties will benefit from the water line extension on <br />Louisiana Avenue from CR 512 to Main Street --twenty-three are less <br />than .25 acre in size, thirteen are less than .50 acre, ten are <br />more than .50 acre and less than 1.0 acre, and nine are greater <br />than 1.0 acre. The Grace's Landing parcel is 8.31 acres. Forty- <br />three of these properties contain improvements such as homes or <br />commercial businesses. There are twelve vacant/unimproved <br />properties. <br />An existing survey will allow design and permitting to commence <br />promptly. Design will be prepared by the Utilities Department <br />staff. A preliminary project cost estimate to be assessed, <br />including construction, engineering, and administrative expenses is <br />estimated at $155,400.00. The estimated cost per square foot is <br />$0.10789373924. This project is to be funded through the <br />assessment of property owners benefiting along the proposed water <br />line route. In the interim, financing will be from the assessment <br />fund. Grace's Landing will be paying 70 water and sewer ERUs, <br />equating to $288,470.00 in impact fees. <br />RECOMMENDATION <br />The staff of the Department of Utility Services recommends approval <br />of the above -listed project authorizing the Department to proceed <br />with the design and engineering work in preparation for the special <br />assessment project. <br />ON MOTION by Commissioner Eggert, SECONDED by <br />Commissioner Tippin, the Board unanimously approved <br />the Louisiana Avenue Water Main project as stated in <br />the memorandum and authorized staff to proceed with <br />the design and engineering work in preparation for <br />the special assessment project, <br />the Memorandum. <br />47 <br />as recommended in <br />November 26, 1996 Boos 99 <br />