My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-259
CBCC
>
Official Documents
>
2020's
>
2025
>
2025-259
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 1:06:08 PM
Creation date
12/9/2025 11:59:53 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
11/18/2025
Control Number
2025-259
Agenda Item Number
9.E.
Entity Name
Aptim Environmental and Infrastructure, LLC
Subject
Work Order 2018029-13 for Sector 5 Hurricanes Nicole and Ian and Dune Restoration
Project Pre-Construction and Engineering Services
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,, APTIM <br />Cost <br />October 22, 2025 <br />Page 2 of 3 <br />Late season sea turtle monitoring, nest relocation, and ancillary professional services in support <br />of the Sector 5 Beach and Dune Restoration Project. <br />This scope of work was developed based on conditions and requirements set forth in standard <br />regulatory permits and the following documents: <br />• Florida Department of Environmental Protection (FDEP) Joint Coastal Permit <br />(JCP) 0363427 -001 -JC <br />• U.S. Fish and Wildlife Service (USFWS) Revised Statewide Programmatic Biological <br />Opinion (BO) dated March 13, 2015 <br />The following tasks may be performed under this work order include: <br />• Task 1: Late Season Sea Turtle Monitoring (FDEP Specific Condition 11) <br />• Task 2: Late Season Nest Relocation and Barricades (FDEP Specific Condition 11) <br />• Task 3: Reporting <br />The lump sum cost for this task is $53,374.46. <br />Summary <br />The total lump sum cost to perform the proposed work described herein for Change Order #1 to Work <br />Order #13 is $53,374.46. Please refer to Exhibit 1, attached to the end of this proposal, for a summary <br />of the costs and labor hours of each Task. APTIM will proceed with the tasks upon receipt of a signed <br />Change Order from Indian River County (unless stated otherwise in the schedule). It is noted that some <br />aspects of this Change Order are dependent upon outside party performance and are outside the control <br />of APTIM and the County. As such, the scope, schedule and cost described herein is provided as an <br />estimate. APTIM will strive to execute each phase of the work within budget and in as expeditious a <br />manner according to construction progress. We will coordinate with the County in the event that the <br />scope, schedule, or budget arise due to unforeseen issues or circumstances. <br />Thank you for the opportunity to serve Indian River County. We look forward to continuing to provide <br />expert professional services to the County. Please do not hesitate to call if you have any questions. <br />Sincerely, <br />Nicole S. Sharp, P.E. <br />Director, Civil and C stal Engineering <br />Aptim Environmental & Infrastructure, LLC <br />Client Authorized Signature <br />Printed Name <br />Title <br />
The URL can be used to link to this page
Your browser does not support the video tag.