My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-262
CBCC
>
Official Documents
>
2020's
>
2025
>
2025-262
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2025 2:06:19 PM
Creation date
12/11/2025 2:05:27 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
11/18/2025
Control Number
2025-262
Agenda Item Number
9.I.
Entity Name
Atkins North America, Inc.
Subject
Engineering Services Work Order 10 for Sebastian Septic to Sewer Conversion Feasibility Study
Project Number
IRCDUS Proj. ID 21.26.502
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit B <br />Cost Detail <br />Work Order No. 10 <br />} <br />SCOPE OF SERVICES <br />Cl AtkinsRealis <br />version A within , lastian City Limits <br />[.J <br />C <br />The following Scope of Services is for professional services relating to the feasibility study <br />associated with the septic to sewer conversion in the City of Sebastian as shown in Figure 1. <br />Upon Notice to Proceed, AtkinsRealis will provide professional services to include project <br />management and engineering services as described herein. <br />City of Sebastian Buildout of Septic to Sewer Conversion <br />Feasibility Study Page 3 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.