My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-262
CBCC
>
Official Documents
>
2020's
>
2025
>
2025-262
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2025 2:06:19 PM
Creation date
12/11/2025 2:05:27 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
11/18/2025
Control Number
2025-262
Agenda Item Number
9.I.
Entity Name
Atkins North America, Inc.
Subject
Engineering Services Work Order 10 for Sebastian Septic to Sewer Conversion Feasibility Study
Project Number
IRCDUS Proj. ID 21.26.502
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit B <br />Cost Detail <br />Work Order No. 10 <br />TASK 05 Feasibility Report <br />Draft Feasibility Report <br />AtkinsRealis <br />AtkinsRealis will prepare a Draft Feasibility Report which will consider key assumptions and <br />design constraints, summarize the customer base, detail projected flow rates, and provide a <br />schematic collection system design by area given with a unique identifier. The collection system <br />design will include: <br />• Gravity sewer mains and anticipated diameter <br />• Force mains and anticipated diameter <br />• Approximate locations of proposed sewer network <br />• Approximate locations of public lift stations <br />• Recommended improvements to existing infrastructure provided by the County's <br />assigned Hydraulic Modeler <br />• Connection points to existing sanitary sewer infrastructure as recommended by the <br />County's Hydraulic Modeler <br />A general and preliminary Project Schedule will be developed to outline the key areas of the <br />initiative, including development of Construction Documents, Bid Phase, and Construction. This <br />schedule is intended solely for planning purposes and is representative of all conversion areas. <br />As the project progresses, the schedule will require updates to accommodate evolving project <br />requirements, regulatory considerations, and coordination with key stakeholders. <br />A feasibility level estimate representing the anticipated construction bid amounts will be <br />developed for each conversion area using the most current information available. These cost <br />estimates are intended to provide a preliminary understanding of the financial implications <br />associated with the recommended collection system and serve as a foundational reference for <br />further decision-making and budgeting. <br />Upon submitting the electronic version of the Draft Feasibility Report, AtkinsRealis will schedule <br />a workshop with County Staff and their Hydraulic Modeler to review the document and discuss <br />their comments. <br />Final Feasibility Report <br />Following the Draft Feasibility Report Workshop, the report will be updated to address review <br />comments. Final deliverables will include an electronic copy and twelve hard copies of the Final <br />Report. An electronic version of the adjudicated review comments will be provided to the County <br />PM for distribution. <br />Upon submitting the electronic version of the Final Feasibility Report, AtkinsRealis will schedule <br />a Workshop with County Staff to discuss attendance and presentations to be made with the Board <br />of County Commissioners and City of Sebastian Council. <br />Deliverables: Draft Feasibility Report, Workshop agenda and notes, Final Feasibility Report with <br />adjudicated review comments. <br />-- -- - - - <br />City of Sebastian Buildout of Septic to Sewer Conversion <br />Feasibility Study Page 6 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.