Laserfiche WebLink
Exhibit B AtkinsRealis <br />Cost Detail <br />Work Order No. 10 <br />ASSUMPTIONS AND EXCLUSIONS <br />The following assumptions have been made in the development of this scope of work, schedule, <br />and fee: <br />1. Subsurface utility engineering, geotechnical services, environmental assessments, and <br />survey services are not required. <br />2. Neighborhood and community meetings are not anticipated or included. <br />3. Permitting is not required for this study. <br />4. The conceptual design will be based on the federal, state, and local codes and standards <br />in effect at the start of the project. <br />5. IRCDUS will provide requested information and project reviews in a timely manner. <br />6. Attendees of the review meetings are designated as decision makers. <br />7. The County's Hydraulic Modeler will provide potable water demand patterns in the area <br />and collaborate with AtkinsRealis on the determination of flow rates and proposed options <br />for the anticipated collection system. <br />8. Any improvements to the existing collection system that are needed for acceptance of the <br />additional flow from the conversion areas that have been or will be developed by the <br />County's Hydraulic Modeler, will be communicated to AtkinsRealis and IRCDUS by the <br />County's Hydraulic Modeler on completion of Task 03 according to the proposed schedule. <br />9. The project schedule and feasibility level estimates are intended solely for planning <br />purposes and exclude escalation factors over time intervals. <br />10. IRCDUS will contract separately with the Hydraulic Modeler. <br />11. The County PM will verify the availability of County Staff to attend meetings and workshops <br />as well as provide timely requests for rescheduling as needed. Attendees of the review <br />meetings are designated as decision makers. <br />12. Lift station and treatment facility design calculations are excluded. <br />13. Laterals to existing and proposed homes and developments will be included as a line item <br />within the feasibility level estimate but excluded in schematic design. <br />14. Costs, schematic design, and evaluation of annexed areas and developer projects, both <br />current and future are excluded. <br />15. This scope of work will not include priority phasing of conversion areas. <br />16. This scope excludes design, costs, and scheduling for water distribution to conversion <br />areas requiring water service. It is assumed that water distribution to conversion areas is <br />being evaluated in the County's Master Plan (in development at the time of this proposal). <br />If available, the County's Hydraulic Modeler will provide this information to AtkinsRealis <br />for incorporating with the feasibility study. <br />City of Sebastian Buildout of Septic to Sewer Conversion <br />Feasibility Study Page 7 of 12 <br />