Work Order
Approved Date
11/18/2025
Control Number
2025-262
Agenda Item Number
9.I.
Entity Name
Atkins North America, Inc.
Subject
Engineering Services Work Order 10 for Sebastian Septic to Sewer Conversion Feasibility Study
Project Number
IRCDUS Proj. ID 21.26.502
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit B 11:1 AtkinsRealis <br />Cost Detail <br />Work Order No. 10 <br />QUALITY CONTROL <br />AtkinsRealis will be responsible for the professional quality of all deliverables. This includes an <br />internal Quality Assurance Plan that, as a minimum, provides review of all deliverables and <br />significant calculations by a qualified professional that was not responsible for project execution. <br />SCHEDULE <br />The anticipated schedule shown below is based on the number of weeks after the formal issuance <br />of the signed Work Order and a Notice to Proceed by the County. <br />Task No. <br />01 <br />02 <br />03 <br />04 <br />05 <br />05 <br />Task Title <br />Kick- Off Workshop <br />Data Collection <br />Define Flow Rates <br />Hydraulic Modeling Coordination <br />Draft Feasibility Report <br />Final Feasibility Report <br />COMPENSATION <br />Duration from NTP <br />2 weeks <br />6 weeks <br />10 weeks <br />12 weeks <br />20 weeks <br />30 weeks <br />The AtkinsRealis Team proposes to perform all services within this scope of work on a Lump Sum <br />basis, with budgets between tasks and expenses being interchangeable. All invoices will include <br />a detailed progress report in support of the invoice amount. <br />The estimated total engineering fee including all labor and expenses associated with the scope <br />of work is not to exceed $288,132.00, as presented below and detailed in Exhibit B. <br />Task No. <br />Task Title Fee <br />01 <br />Project Management <br />$ 44,980.00 <br />$ 16,624.00 <br />02 <br />Data Collection <br />03 <br />Define Flow Rates <br />$ 29,760.00 <br />$ 29,600.00 <br />$ 161,168.00 <br />$ 6,000.00 <br />$ 288,132.00 <br />04 <br />Hydraulic Modeling Coordination <br />05 <br />EXP <br />Feasibility Report <br />Expenses <br />Total <br />City of Sebastian Buildout of Septic to Sewer Conversion <br />Feasibility Study Page 8 of 12 <br />