My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DELETE (2)
CBCC
>
Meetings
>
2020's
>
2025
>
DELETE (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2025 9:19:14 AM
Creation date
12/15/2025 9:18:43 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
09/23/2025
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
155
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Deliverables: <br /> • Draft IWMP Module t Vetoniiing <br /> • IWMP Roadmap <br /> Task 3 Evaluate Exiatitto Perbyttlatee <br /> 3.1 Detailed Desktop Data Review <br /> 3.1.1 Follow-Up Document and Data Request and Review <br /> CONSULTANT will review the status of data and documents requested in Task 2.1.1 <br /> and will submit a supplemental data and document request. This request will include <br /> information requested but not received in Task 2.1.1, clarification on information <br /> received, as well as any new data and documents not previously requested. The <br /> purpose of this data request is to collect additional data, reports, and relevant <br /> information that CONSULTANT is made aware of during Task 2. <br /> CONSULTANT will perform a detailed review of operational data, monitoring data, asset <br /> inventory, previous master plans, CIPs, and other available data to inform workshop <br /> discussions. CONSULTANT will compile findings as a section in Draft IWMP Module 2: <br /> Existing System Performance. <br /> 3.1.2 Regulatory Review—Detailed <br /> As regulatory drivers evolve over the course of the development and implementation of <br /> the IWMP, it will be necessary to analyze and interpret existing and new data to <br /> prioritize water quality issues and better understand long-term planning needs. <br /> CONSULTANT will evaluate data compiled during the project with respect to regulatory <br /> drivers and provide analyses relevant to planning and implementation of the IWMP <br /> (e.g., relative water quality impacts, timing, relative magnitude of fiscal impacts, etc.). <br /> Regulations identified will include relevant new (e.g., PFAS rule) and emerging (e.g., <br /> M/DBP rule) regulations which may impact drinking water, wastewater, and reuse. <br /> CONSULTANT will develop a regulatory timeline to visualize identified regulatory <br /> milestones, deadlines, and other triggers over a 20-year planning horizon. Timeline will <br /> be delivered to COUNTY and incorporated into the IP Framework document. <br /> Working with the COUNTY and their counsel, the CONSULTANT will engage the <br /> Florida Department of Environmental Protection (FDEP) to coordinate endorsement of <br /> the IWMP. This coordination will likely involve a series of meetings with FDEP to gain <br /> buy-in and discuss IWMP elements. <br /> 3.2 Vertical Asset Capacity Assessment <br /> CONSULTANT will perform desktop capacity assessments of treatment infrastructure <br /> and develop alternative improvement strategies for identified infrastructure or capacity <br /> deficiencies. CONSULTANT will utilize the 2045 horizon for determining needed <br /> infrastructure upgrades for mechanical and electrical equipment. CONSULTANT will <br /> utilize the 2075 horizon as needed to assess new basin capacities and facilities. <br /> CONSULTANT will develop an Excel workbook to record COUNTY's existing treatment <br /> capacities as well as industry standard capacities for comparison. CONSULTANT will <br /> use projections developed in Task 5.2 to define the expected demands and flows of the <br /> 2045 and 2075 planning horizons. <br /> 5 305 <br />
The URL can be used to link to this page
Your browser does not support the video tag.