Laserfiche WebLink
EXHIBIT A—SCOPE OF WORK <br /> The County desires to extend Aviation Boulevard east of US Highway 1 to provide an <br /> alternative mobility connection to the Cleveland Clinic Indian River Hospital. Presently, the <br /> primary mobility access is obtained from 37th Street located between US Highway 1 and Indian <br /> River Boulevard. The roadway extension will consist of constructing Aviation Boulevard as a 2- <br /> lane roadway with buffered bike lanes and pedestrian facilities along both sides of the corridor. <br /> The extension of Aviation Boulevard east of the Florida Department of Transportation (FDOT) <br /> State Road 5/US 1 at Aviation Boulevard Project Development and Environmental (PD&E) Study <br /> eastern termini will be consistent with the Preferred Alignment identified in the Aviation <br /> Boulevard Extension Alternative Alignment Study. <br /> The Aviation Boulevard extension typical section from 33rd Street to 36th Street is proposed to <br /> be a right-of-way width that varies between 90- to 122-foot. The roadway typical sections <br /> consist of the following elements: <br /> • Urban section (curb &gutter) <br /> • Rural section (roadside swales) <br /> • Two travel lanes <br /> • 7-foot wide paved outside shoulders (buffered bike lanes) <br /> • 6-foot wide concrete sidewalks located along both sides of the corridor <br /> A. Supplemental Topographic Design Survey: <br /> The Consultant will provide supplemental topographic design survey services necessary to <br /> support and facilitate contemplated design and permitting activities associated with this <br /> project. This task will consist of the preparation of digital base map topographic surveys in <br /> accordance with the Standards of Practice, established by the Board of Professional <br /> Surveyors and Mappers, Chapter 5J-17, Florida Administrative Codes, pursuant to current <br /> Section 472.027, Florida Statutes, per 5J-17.050 through 5J-17.052. The survey will include: <br /> The survey will include: <br /> 1. Establishment of a project wide Horizontal Control Network within the PROJECT LIMITS. <br /> A Design Survey Baseline will be established and monumented. A minimum of six <br /> Design Survey Baseline monuments will be installed. <br /> 2. Establishment of a project wide Vertical Control Network within the PROJECT LIMITS. All <br /> elevations will be referenced to NAVD 1988 datum. <br /> The limits of the supplemental topographic design survey are as follows: <br /> Page 2 of 8 <br />