My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-287
CBCC
>
Official Documents
>
2020's
>
2025
>
2025-287
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2025 1:17:22 PM
Creation date
12/19/2025 1:17:21 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
12/09/2025
Control Number
2025-287
Agenda Item Number
9Y.
Entity Name
Kimley-Horn & Associates, Inc
Subject
Engineering Services Work Order 26 for Aviation Blvd Extension (33rd Street – 36th Street
Project Number
IRC-1761
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
13th Avenue - between 32nd and 33rd Street to assist in designing the proposed <br /> roadway and drainage improvements identified within this area. <br /> Van Valkenberg Creek — supplemental survey data is needed at the western <br /> terminus of the existing creek to assist in designing outfall improvements <br /> needed to serve the proposed stormwater management facilities. <br /> Legal Description & Sketch — the Consultant will prepare up to six (6) legal <br /> description and sketches to support the acquisition of property and/or <br /> easements identified. <br /> B. Supplemental Geotechnical Investigation: <br /> The Consultant will retain the services of a Geotechnical sub-consultant to assist in <br /> evaluating the existing soil and roadway pavement conditions. Due to the change in <br /> State water quality standards, additional geotechnical investigation will be needed. The <br /> supplemental geotechnical investigation may include the following services: <br /> 1. Field Exploration Program <br /> • Soil permeability testing <br /> • 6-feet deep hand augers <br /> • 10-feet deep hand augers <br /> 2. Engineering Analysis and Report <br /> The Geotechnical Sub-Consultant Engineer shall perform analysis of all the data <br /> obtained to evaluate subsurface conditions and develop engineering recommendations. <br /> C. Construction Documents: <br /> The Construction plan set shall consist of the following: <br /> Page 3 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.