Laserfiche WebLink
PHASE SUBMITTALS 60% 90% 100% <br /> Cover Sheet (Location map, Project <br /> Length, Engineer of Record) C F F <br /> General Notes C C F <br /> Summary of Pay Items/Quantities P C F <br /> Horizontal and Vertical Control Sheets <br /> (Benchmarks, Reference Points, Section C C F <br /> Corners) <br /> Details P C F <br /> Plan and Profile Sheets (40 scale) C C F <br /> Cross Sections at approximately 100 ft <br /> intervals, extending 10'beyond proposed <br /> right-of-way (1"=5' Vertically, C C F <br /> 1"=20'Horizontally) <br /> Signage & Pavement Marking Plans P C F <br /> (40 scale) Included in Plan Sheets <br /> Signalization Plans P C F <br /> Stormwater Pollution Prevention Plans C C C <br /> Construction Cost Estimate and <br /> Quantities C C F <br /> Notes: P— Preliminary, C—Complete, but subject to change, F - Final <br /> General Construction Plan Requirements: <br /> 2. Plans shall be prepared on 11" x 17" sheets. <br /> 3. Each phase submittal shall include drawings in PDF format. <br /> 4. Plan sheets shall depict existing right-of-way, section lines, property lines, and <br /> centerline of construction. Horizontal control points with state plane <br /> coordinates for all PC's, PT's, curve radius, curve length and horizontal Pi's shall <br /> be included on the Plan or summarized in an alignment table. <br /> 5. Plans shall include spot grades adequate to describe any proposed grading. <br /> 6. Match lines shall not be located within the limits of an intersection. <br /> 7. All quantities shall reference FDOT Pay Item Numbers. <br /> 8. All details shall reference FDOT Index Numbers. <br /> 9. All specifications shall reference to FDOT Specifications for Road and Bridge <br /> Construction. Any deviations are special specifications not included in FDOT <br /> Specifications are required in the Technical Specifications. <br /> Page 4 of 8 <br />