My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-291
CBCC
>
Official Documents
>
2020's
>
2025
>
2025-291
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2025 1:41:10 PM
Creation date
12/19/2025 1:39:54 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
12/09/2025
Control Number
2025-291
Agenda Item Number
16.B.2.
Entity Name
Geosyntec Consultants
Subject
Work Order 10 for Annual Compliance Monitoring and Reporting for 2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Himanshu H. Mehta, P.E. <br />13 November 2025 <br />Page 10 <br />• Annual Title V Emissions Fee: The EAOR application used for reporting to the FDEP <br />will automatically calculate the annual emission fee for the facility. Geosyntec will <br />notify the SWDD of the fee amount and will submit the check for payment of the fee on <br />behalf of the SWDD prior to the April I deadline. <br />• Annual LFG Sulfur Content Test: Geosyntec will collect three samples of LFG <br />annually to determine the sulfur content in accordance with ASTM Method D5504-12 or <br />D7493. The samples will be tested by a certified air testing laboratory. The laboratory <br />test results will be used to calculate sulfur emissions and a report prepared for submittal <br />to the FDEP. The LFG sulfur content testing will be completed no later than 31 <br />December 2026, and the corresponding reporting will be completed no later than 45 days <br />after testing. <br />Phase 6 — Technical and Miscellaneous Permit Compliance Support and Reporting <br />Under this phase, Geosyntec will provide the SWDD with technical support and miscellaneous <br />permit compliance support services related to the Class I landfill and C&D disposal facility on an <br />as -needed basis. These services may include: <br />• reporting required by the Multi -Sector Generic Permit for stormwater discharge; <br />• quarterly monitoring and reporting of the LFG monitoring wells located at the perimeter <br />of the site and also in enclosed structures; <br />• miscellaneous permit and compliance support services; <br />• assistance with preparing annual budgets for the SWDD; <br />• preparing agenda items for and attending the SWDD Board of County Commissioners <br />meetings upon request; <br />• sampling and reporting for additional monitoring wells and surface water for the C&D <br />debris disposal facility depending on the results of the semi-annual and quarterly <br />sampling and analytical testing; and <br />• other services as needed. <br />As part of these services, Geosyntec proposes to assist the SWDD with the evaluation and <br />resolution of issues pertaining to the exceedances in select analytes of the C&D debris disposal <br />facility and Class I landfill monitoring wells and surface sample sites should these issues arise. <br />NCP2525467/2026 Compliance Monitoring Proposal_F <br />ngineers I scientists i innovators <br />
The URL can be used to link to this page
Your browser does not support the video tag.