My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-291
CBCC
>
Official Documents
>
2020's
>
2025
>
2025-291
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2025 1:41:10 PM
Creation date
12/19/2025 1:39:54 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
12/09/2025
Control Number
2025-291
Agenda Item Number
16.B.2.
Entity Name
Geosyntec Consultants
Subject
Work Order 10 for Annual Compliance Monitoring and Reporting for 2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Himanshu H. Mehta, P.E. <br />13 November 2025 <br />Page 4 <br />in November 2020. During the 2021 quarterly sampling, Geosyntec working on behalf of the <br />SWDD reduced the quarterly parameters analyzed and negotiated the use of a site-specific <br />ammonia GCTL based on TAN calculations thus adding a surface water screening location north <br />of MW -53S. In 2024, Geosyntec further reduced the sampling scope for the remaining <br />evaluation monitoring wells at the Class I landfill. <br />Therefore, sampling of the seven Class I landfill groundwater evaluation monitoring wells and <br />four surface water sample sites will be included in the quarterly monitoring and reporting <br />program for 2026. <br />Storage Tank Groundwater Monitoring Wells Sampling and Reporting <br />Permit Modification No. 0128769 -033 -SO -MM' and Approval of Request for Alternate <br />Procedure — SWAP 22-1 (i.e., Order), effective 22 July 2022, authorized the SWDD to use an <br />existing 500,000 -gallon tank as a leachate storage tank for the leachate evaporator system for the <br />Class I Landfill. Conditions of this approval required the SWDD to install four new groundwater <br />monitoring wells (MW -49 to MW -52) around the periphery of the leachate storage tank, which <br />were installed in February 2023. Upon well installations, the SWDD was also required to <br />conduct an initial and three additional sampling events (on a weekly basis) and conduct two <br />quarterly sampling events after the initial filling of the tank with leachate. Based on the timeline <br />of when the tank was initially filled with leachate on 30 August 2023, the well installations, <br />initial sampling event, and three weekly sampling events were documented to the FDEP in 2023. <br />In 2025, Geosyntec completed four quarters of sampling from these wells and submitted the two <br />Semiannual Reports. Based on review of the July 2022 Order, in 2026, the quarterly sampling is <br />required to continue, and an Annual Report will be submitted to FDEP on behalf of SWDD. <br />Title V Air Operation Permit Compliance <br />The SWDD was issued a Title V Air Operation renewal permit (Permit No. 0610015 -010 -AV), <br />proposed on 7 December 2022. The permit requires that the SWDD prepare and submit to the <br />FDEP and the U.S. Environmental Protection Agency (USEPA), Region 4 the following: <br />• Annual statement of compliance (within 60 days after the end of the calendar year); <br />• Electronic Annual Operating Report (AOR) and Title V Emissions Fee (on or before <br />April 1 of each year, for the previous calendar year); <br />• Semi -Annual Monitoring Report (scheduled for March 1 and August 29); and <br />' These changes are also reflected in Permit Modification No. 0128769 -034 -SO -MM <br />NCP2525467/2026 Compliance Monitoring Proposal_F <br />engineers I scientists I innovators <br />
The URL can be used to link to this page
Your browser does not support the video tag.