My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-291
CBCC
>
Official Documents
>
2020's
>
2025
>
2025-291
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2025 1:41:10 PM
Creation date
12/19/2025 1:39:54 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
12/09/2025
Control Number
2025-291
Agenda Item Number
16.B.2.
Entity Name
Geosyntec Consultants
Subject
Work Order 10 for Annual Compliance Monitoring and Reporting for 2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Himanshu H. Mehta, P.E. <br />13 November 2025 <br />Page 6 <br />The proposed scope of services includes activities to be performed on behalf of the SWDD for <br />the compliance monitoring reporting and other technical support services for the Class I landfill <br />and C&D debris disposal facility. For the purpose of budgeting, the scope of work has been <br />divided into the following six (6) main phases: <br />• Phase 1 — General Consulting/Meeting Support/Project Management; <br />• Phase 2 — Semi -Annual Sampling and Reporting; <br />• Phase 3 — Quarterly Assessment Monitoring and Reporting; <br />• Phase 4 — Storage Tank Groundwater Monitoring Well Sampling and Reporting; <br />• Phase 5 — Title V Permit Compliance and Reporting; and <br />• Phase 6 — Technical and Miscellaneous Permit Compliance Support and Reporting. <br />The above scope of services is based on current regulations and reporting requirements for the <br />IRCL facility as previously discussed above. An amendment to this scope of services may be <br />needed should there be any regulatory changes that result in additional work. The remainder of <br />this section presents a general description of the activities to be performed in each phase. <br />Phase 1— General Consulting/Meetina Support/Proiect Manasement <br />Under this phase, Geosyntec will perform project planning and management responsibilities, <br />such as correspondence with the SWDD and FDEP, project coordination, and project <br />administration. Project management activities will include budget and schedule tracking, invoice <br />review, and project communications, including the preparation of a monthly progress report. <br />The report will include a description of the activities completed during the month and planned <br />activities for the following month. Geosyntec has also included budget for preparation and <br />attendance (by two Geosyntec personnel) at one meeting with the SWDD and/or FDEP, as <br />needed. <br />Phase 2 — Semi -Annual Sampling and Reporting (Both C&D Debris Disposal Facility and <br />Class I Landfill) <br />Geosyntec will assist the SWDD to perform the semi-annual sampling and prepare the water - <br />quality monitoring reports as required by the WQMP. Geosyntec will assist the SWDD with <br />conducting all field sampling preparation activities, including scheduling, staffing, <br />subcontracting, and field equipment preparation. Prior to collecting the groundwater samples in <br />January and July 2026, Geosyntec will perform water -level measurements from the Site <br />monitoring well network and installed staff gauges adjacent to the Site. Geosyntec will then <br />perform semi-annual sampling of the Class I landfill and C&D debris disposal facility <br />NCP2525467/2026 Compliance Monitoring Proposal_F <br />engineers I scientists I innovators <br />
The URL can be used to link to this page
Your browser does not support the video tag.