My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-292
CBCC
>
Official Documents
>
2020's
>
2025
>
2025-292
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2025 1:45:03 PM
Creation date
12/19/2025 1:44:08 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
12/09/2025
Control Number
2025-292
Agenda Item Number
16.B.4.
Entity Name
Stearns Conrad and Schmidt dba SCS Field Services
Subject
Amendment No. 1 to Agreement for Landfill Gas System Evaluation
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Environmental <br />Consulting & Contracting <br />November 10, 2025 <br />Himanshu Mehta <br />Managing Director <br />Indian River County - Solid Waste Disposal District <br />1325 74th Avenue SW <br />Vero Beach, FL 32968 <br />Subject: Phase Two and Phase Three: Segment Three Cells One and Two Vertical Well <br />Installation Proposal <br />Indian River Landfill, Vero Beach, Florida <br />Dear Mr. Mehta: <br />SCS Field Services (SCS -FS) is pleased to provide this proposal to you for the subject work based on <br />discussions between SCS -FS, Nopetro Energy and Indian River County (IRC). SCS -FS is prepared to <br />schedule the work following approval by the County. A summary of the scope of work and cost is <br />outlined below. <br />SCOPE OF WORK <br />Phase Two: Vertical Wellhead and Dewatering Pump Installation <br />SCS -FS will provide labor equipment and materials to install new vertical wellheads and dewatering <br />pumps based on the following scope of work description: <br />• Each new vertical well will be equipped with a dual extraction flanged 8 -inch well cap, an orifice <br />plate style QED 2 -inch wellhead, flex hose and hose clamps. <br />• A QED AP -plus bottom loading pneumatic pump, triple sleeved tubing, air/filter regulator, cycle <br />counter, 1 -inch discharge hose and all necessary stainless steel hardware to connect to the air <br />and forcemain riser pipes. The pump will be initially installed approx. 20 feet above the bottom of <br />the well. <br />Phase Three: HDPE Vacuum Lateral, Air and Forcemain Piping Installation <br />SCS -FS will provide labor equipment and materials to install new HDPE vacuum lateral (SDR -17), air (SDR - <br />9) and forcemain (SDR -11) piping based on Figure 1. and following scope of work description: <br />Install approx. 340 feet of 24 -inch vacuum lateral, 2 -inch air and 3 -inch forcemain piping from <br />the existing 24 -inch blind flange to the northeast corner of cell two. A 24 -inch isolation valve <br />and two 4 -inch header access risers will be installed at the existing blind flange location and a <br />new blind flange will be installed at the end of the 24 -inch pipe for future connection. <br />Install approx. 490 feet of 12 -inch vacuum lateral, 2 -inch air and 3 -inch forcemain piping from <br />the existing 12 -inch blind flange located at well EW -2405 and extend north over the top of cell <br />two to the 24 -inch header pipe tie-in on the northeast corner of cell two. A 12 -inch header <br />258 Southhall Ln, Suite 310, Maitland, Florida 32751 <br />
The URL can be used to link to this page
Your browser does not support the video tag.