My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-292
CBCC
>
Official Documents
>
2020's
>
2025
>
2025-292
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2025 1:45:03 PM
Creation date
12/19/2025 1:44:08 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
12/09/2025
Control Number
2025-292
Agenda Item Number
16.B.4.
Entity Name
Stearns Conrad and Schmidt dba SCS Field Services
Subject
Amendment No. 1 to Agreement for Landfill Gas System Evaluation
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Himanshu Mehta <br />November 10, 2025 <br />Page 2 <br />isolation valve and two 4 -inch header access risers will be installed at each end of the new 12 - <br />inch tie-in locations. Air and forcemain valves will also be installed at each of the tie-in <br />locations. <br />• Install 790 feet of 6 -inch remote lateral, 2 -inch air and 3 -inch forcemain piping for wells EW - <br />182, EW -184, EW -185, EW -186, and EW -187. <br />• Install one 12x6 -inch reducing tee vacuum riser, 2 -inch air and 3 -inch forcemain risers at well <br />EW -188. <br />• Install 100 feet of 8 -inch vacuum lateral, 2 -inch air and 3 -inch forcemain piping to well EW - <br />181. <br />• Install 410 feet of 6 -inch vacuum lateral, 2 -inch air and 3 -inch forcemain piping to wells EW - <br />180, EW -183 and EW -189. <br />• Clean fill will be backfilled around all piping. Trench spoils that cannot be backfilled will be <br />transported to the active working face by SCS -FS. <br />• As built survey data will be provided by SCS -FS following the completion of the project. <br />ASSUMPTIONS AND CONDITIONS <br />The scope of work is based on the following assumptions: <br />• At a minimum, SCS -FS will have site access and permission to work Monday through Sunday <br />from 7:00 AM to 7:00 PM. <br />• The scope of work is based on one drill rig mobilization and demobilization. If additional <br />mobilizations are needed there will be an additional cost based on the fee schedule. <br />• Piping installation quantities are approximate and may vary. <br />• The work area will be accessible and free of obstructions or other work activities performed by <br />others that could delay the installation process. <br />• SCS -FS may limit or restrict access to all traffic adjacent to the work area as needed. <br />• Any additional drug testing or personnel background requirements to work for this project - <br />those costs need to be passed through. Also, consider the time it takes to perform these <br />checks/tests. <br />• Additional change orders may be needed if changes to the scopes of work, as described <br />above, or if additional costs are incurred due to unforeseen circumstances. <br />• Payment terms to SCS -FS will be NET 30 or less. <br />• Scope of work does not include side slope collector installations. <br />