Laserfiche WebLink
Mr. Himanshu Mehta <br />November 10, 2025 <br />Page 3 <br />COMPENSATION <br />SCS -FS can perform the services described in the scope of work based on the following unit rates. A <br />detailed budgetary breakdown is provided in Table 1 <br />Construction Bond <br />Unit Rate <br />Qty. <br />Sub -Total <br />Construction Bond for Phases One, Two & Three <br />$5,000.00 <br />1 <br />$5,000.00 <br />Phase Two Description <br />Unit Rate <br />Qty. <br />Sub -Total <br />QED Wellhead Installation including Hoses, Clamps and <br />$2,150.00 <br />10 <br />$21,500.00 <br />8" Dual Extraction Well Cap <br />QED Pump Installation includes all Hardware, <br />$7,000.00 <br />10 <br />$70,000.00 <br />Accessories, Hoses from Air to FM <br />Phase Three Description <br />Unit Rate <br />Qty. <br />Sub -Total <br />Header Pipe Installation including Air and Forcemain <br />$325,000.00 <br />Lump Sum <br />$325,000.00 <br />Piping, One 24" Valve and Two 12" Vales <br />Total: <br />$421,500.00 <br />CLOSING <br />SCS -FS appreciates the opportunity to provide our proposal to Indian River County. If you have any <br />questions or require any additional information, please contact Brian Basconi at 401-486-4897. <br />Sincerely, <br />f, - /� O.Qc " <br />Brian Basconi <br />Project Manager <br />SCS Field Services <br />BB/GAC <br />Garold (Tony) A. Cartee <br />Regional Manager/ Vice President <br />SCS Field Services <br />