My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-293
CBCC
>
Official Documents
>
2020's
>
2025
>
2025-293
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2025 1:53:29 PM
Creation date
12/19/2025 1:52:22 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
12/09/2025
Control Number
2025-293
Agenda Item Number
16.B.5.
Entity Name
Geosyntec Consultants, Inc.
Subject
Work Order No. 1 Design Partial and Temporary Closure of Cell 1/2 and Evaluate
the Gas Collection and Control System (GCCS)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Himanshu Mehta, P. E. <br />21 November 2025 <br />Page 2 <br />Phase 1: General Consulting/Meeting Support/Project Management <br />Phase 1 consists of three components: general consulting, meeting support, updating the site health <br />and safety plan, and project management. Geosyntec will provide SWDD with consulting services <br />necessary to initiate the project. Geosyntec will prepare presentation graphics, engineering <br />drawings, and other documents required to support the Project's meetings and coordination <br />activities. <br />A kickoff meeting with SWDD is proposed before the start of project activities so that the specific <br />project requirements can be discussed. If required by SWDD, Geosyntec will prepare for and <br />attend a meeting with the SWDD Board to explain the project scope and budget requirements. In <br />addition, review meetings will be held with SWDD during the various phases of the project <br />implementation schedule. Following each meeting, Geosyntec will prepare meeting minutes that <br />document decisions reached in the meetings. <br />Project management activities will include: budget and schedule tracking, invoice review, and <br />project communications, including the preparation of a monthly progress report. The project report <br />will include a description of the activities completed during the month and planned activities for <br />the following month. In addition, the progress report will identify any technical or administrative <br />issues that require SWDD's attention and the current status of the budget and schedule. <br />For the purpose of this budget estimate, Geosyntec has included three meetings under Phase 1: (i) <br />one kickoff meeting with SWDD; (ii) one meeting with the SWDD Board, if requested by SWDD; <br />and (iii) one meeting with SWDD at the completion of Phase 7 of the Project. Additional meetings <br />are addressed in the remaining phases of this proposal. <br />Phase 2: Closure Alternative Evaluation, Costing, and Selection <br />This phase will include a comparative evaluation of up to three closure alternatives, assumed to <br />include a conventional cap (geomembrane plus two feet of vegetated cover soil), ClosureTurf® <br />final cover system, and an alternative cap that utilizes geosynthetic clay liner (GCL) material <br />instead of geomembrane. <br />The closure alternative evaluation will consider, at a minimum, the following criteria: <br />environmental protection and impacts, regulatory consistency, cost, schedule, and constructability. <br />Geosyntec will summarize the evaluation criteria above in a brief memorandum and meet with <br />IRC SWDD to review and develop a final ranking of the options presented. Geosyntec anticipates <br />the preferred closure method will be identified following the meeting with IRC SWDD. <br />NCP2525235\IRC Partial Closure & GCCS Evaluation <br />engineers I scientists I innovators <br />
The URL can be used to link to this page
Your browser does not support the video tag.