Laserfiche WebLink
U. S. DOT CROSSING INVENTORY FORM <br />DEPARTMENT OF TRANSPORTATION <br />FEDERAL RAILROAD ADMINISTRATION EXHIBIT C OMB No. 2130-0017 <br />Instructions for the initial reporting of the following types of new or previously unreported crossings: For public highway -rail grade crossings, complete the entire inventory <br />Form. For private highway -rail grade crossings, complete the Header, Parts I and 11, and the Submission Information section. For public pathway grade crossings (including <br />pedestrian station grade crossings), complete the Header, Parts I and 11, and the Submission Information section. For Private pathway grade crossings, complete the Header, <br />Parts I and 11, and the Submission Information section. For grade -separated highway -rail or pathway crossings (including pedestrian station crossings), complete the Header, Part <br />I, and the Submission Information section. For changes to existing data, complete the Header, Part I Items 1-3, and the Submission Information section, in addition to the <br />updated data fields. Note: For private crossings only, Part I Item 20 and Part III Item 2.K. are required unless otherwise noted. An asterisk * denotes an optional field. <br />A. Revision Date <br />B. Reporting Agency <br />C. Reason for Update (Select only one) <br />D. DOT Crossing <br />(MM/DD/YYYY) <br />❑ Railroad ❑ Transit <br />❑ Change in ❑ New ❑ Closed ❑ No Train ❑ Quiet <br />Inventory Number <br />Data Crossing Traffic Zone Update <br />❑ State ❑ Other <br />❑ Re -Open ❑ Date ❑ Change in Primary ❑ Admin. <br />Change Only Operating RR Correction <br />Part <br />I: Location and Classification Information <br />1. Primary Operating Railroad <br />2. State <br />3. County <br />4. City / Municipality <br />S. Street/Road Name & Block Number <br />6. Highway Type & No. <br />❑ In <br />I <br />❑ Near <br />(Street/Rood Name) I * (Block Number) <br />7. Do Other Railroads Operate a Separate Track at Crossing? ❑ Yes ❑ No <br />8. Do Other Railroads Operate Over Your Track at Crossing? ❑ Yes ❑ No <br />If Yes, Specify RR <br />If Yes, Specify RR <br />9. Railroad Division or Region <br />10. Railroad Subdivision or District <br />11. Branch or Line Name <br />12. RR Milepost <br />❑ None <br />❑ None <br />❑ None <br />-1-1 <br />(prefix) I (nnnn.nnn) I (suffix) <br />13. Line Segment <br />14. Nearest RR Timetable <br />15. Parent RR (if applicable) <br />16. Crossing Owner (if applicable) <br />* <br />Station <br />❑ N/A <br />❑ N/A <br />17. Crossing Type <br />18. Crossing Purpose <br />19. Crossing Position <br />20. Public Access <br />21. Type of Train <br />22. Average Passenger <br />❑ Highway <br />❑ At Grade <br />(if Private Crossing) <br />❑ Freight ❑ Transit <br />Train Count Per Day <br />❑ Public <br />❑ Pathway, Ped. <br />❑ RR Under <br />❑ Yes <br />❑ Intercity Passenger ❑ Shared Use Transit <br />❑ Less Than One Per Day <br />❑ Private <br />❑ Station, Ped. <br />❑ RR Over <br />❑ No <br />❑ Commuter ❑ Tourist/Other <br />❑ Number Per Day_ <br />23. Type of Land Use <br />❑ Open Space ❑ Farm ❑ Residential ❑ Commercial ❑ Industrial ❑ Institutional ❑ Recreational ❑ RR Yard <br />24. Is there an Adjacent Crossing with a Separate Number? <br />25. Quiet Zone (FRA provided) <br />❑ Yes ❑ No If Yes, Provide Crossing Number <br />❑ No ❑ 24 Hr ❑ Partial ❑ Chicago Excused Date Established <br />26. HSR Corridor ID <br />27. Latitude in decimal degrees <br />28. Longitude in decimal degrees <br />29. Lat/Long Source <br />❑ N/A <br />(WGS84 std: nn.nnnnnnn) <br />(WGS84 std: -nnn.nnnnnnn) <br />❑ Actual ❑ Estimated <br />30.A. Railroad Use * <br />31.A. State Use <br />30.B. Railroad Use * <br />31.B. State Use <br />30.C. Railroad Use * <br />31.C. State Use <br />30.D. Railroad Use * <br />31.D. State Use <br />32.A. Narrative (Railroad Use) * <br />32.13. Narrative (State Use) <br />33. Emergency Notification Telephone No. (posted) <br />34. Railroad Contact (Telephone No.) <br />35. State Contact (Telephone No.) <br />Part II: Railroad Information <br />1. Estimated Number of Daily Train Movements <br />1.A. Total Day Thru Trains <br />1.B. Total Night Thru Trains1.C. <br />Total Switching Trains <br />1.D. Total Transit Trains <br />1.E. Check if Less Than <br />(6 AM to 6 PM) <br />(6 PM to 6 AM) <br />One Movement Per Day El <br />How many trains per week? <br />2. Year of Train Count Data (YYYY) <br />3. Speed of Train at Crossing <br />73.B. <br />3.A. Maximum Timetable Speed (mph) <br />Typical Speed Range Over Crossing (mph) From _ to <br />4. Type and Count of Tracks <br />Main Siding Yard Transit Industry <br />S. Train Detection (Main Track only) <br />❑ Constant Warning Time ❑ Motion Detection ❑AFO ❑ PTC ❑ DC ❑ Other ❑ None <br />6. Is Track Signaled? 7.A. <br />Event Recorder <br />7.6. Remote Health Monitoring <br />❑ Yes ❑ No I <br />❑ Yes ❑ No <br />❑ Yes ❑ No <br />FORM FRA F 6180.71 (Rev. 3/15) OMB approval expires 01/31/2026 Pagel OF 2 <br />