My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-001
CBCC
>
Official Documents
>
2020's
>
2026
>
2026-001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2026 9:55:01 AM
Creation date
1/12/2026 9:52:42 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
01/05/2026
Control Number
2026-001
Agenda Item Number
Signed by County Adminisrator
Entity Name
Morgan & Eklund, Inc.
Subject
Work Order No. 9 for Continuing Contract Agreement for
2026 Winter Semi-Annual Coastal Monitoring Surveys
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M&E <br />Morgan & Eklund, Inc. <br />4909 US Highway 1 Phone: 772-388-5364 <br />Vero Beach, Florida 32967 Fax: 772-38B-3165 <br />December 19, 2025 <br />Indian River County <br />Natural Resources Department - Coastal Division <br />Attn: Quintin Bergman, Coastal Resource Manager <br />1801 27th Street <br />Vero Beach, FL 32960 <br />RE: 2026 Winter Semi -Annual Indian River County Coastal Monitoring Surveys; <br />Onshore/Offshore Profiles along FDEP Range Lines R-15 to R-119 <br />Dear Quintin: <br />Morgan & Eklund, Inc. (M&E) is pleased to provide you with the following proposal to furnish <br />professional land and hydrographic survey services for the above-mentioned project. <br />Scope of work will be as follows: <br />2026 Winter Profiles, 105 Lines (Jan/Feb) <br />• Task 1) Sector 3 (R15 to R60) — 46 lines <br />• Task 2) Sector 4 (R61 to R64) — 4 lines <br />• Task 3) Sector 5 (R65 to R91) — 27 lines, Sector 5 is being constructed this winter <br />window. Please make a note on the profiles when data includes a new dune or <br />active construction. <br />• Task 4) South County (R92 to R119) — 28 lines <br />Onshore/offshore profile lines begin with the recovery of site control monumentation and <br />establishing 2 temporary control points along each profile alignment using GNSS RTK. Crews <br />use Automatic Levels to conduct level loops that begin and close on these temporary control <br />points. Hydrographic survey elevations are used to verify against tidal measurements, relative to <br />site control. <br />The upland portion of the profile is conducted landward of the MLLW using GNSS RTK <br />equipment where site conditions allow. If the upland area is heavily vegetated, an Automatic <br />Level and survey rod, with the aid of Azimuth stakes and a laser electronic distance <br />measurement device provide infill. <br />
The URL can be used to link to this page
Your browser does not support the video tag.