Laserfiche WebLink
The wade portion of the profile is also performed using an Automatic Level, survey rod, and <br />laser and data is collected from the beach berm out to approximately -8' or as the ocean <br />conditions allow. <br />The offshore portion of each profile is collected using a survey vessel equipped with Hypack <br />hydrographic collection software along with GNSS RTK positioning, inertial motion <br />compensation, and Sonar equipment, typically to a distance of 3000' offshore. Sound velocity <br />and Bar Check calibrations are conducted at the beginning and conclusion of daily operations. <br />The three overlapping data sets are then displayed and analyzed in plan and/or profile view as a <br />means of merging the data sets and conducting quality assurance. Merged alignment data are <br />then plotted in profile view along with historic profile data as a final quality assurance procedure <br />prior to the final product being prepared. <br />All data collected will be in accordance with the FDEP-approved Physical Monitoring Plan. <br />M&E will provide the County with beach profile data in ASCII file format together with <br />AutoCAD drawings signed by the surveyor. We will also provide FDEP submittal package. <br />Our price will be as follows: <br />Chief Surveyor <br />8.5 hours @ $171/hr.......................................$ 1,453.50 <br />Senior Project Manager <br />5 hours @ $132/hr.......................................... $ 660.00 <br />Senior Survey Computer Technician <br />45 hours @ $103/hr........................................$ 4,635.00 <br />Project Manager <br />20 hours @ $108/hr........................................ $ 2,160.00 <br />Assistant Project Manager <br />3.5 hours @$85/hr.........................................$ 297.50 <br />Hydrographic Lead Surveyor <br />37.5 hours @ $107/hr.....................................$ <br />4,012.50 <br />Survey Technician (Boat) <br />37.5 hours @$82/hr.......................................$ <br />3,075.00 <br />Three Man Survey Crew <br />173 hours @ $180/hr...................................... <br />$ 31,140.00 <br />26' Parker Survey Boat <br />4.5 days @ $600/day......................................$ <br />2,700.00 <br />Applanix POS WaveMaster <br />4.5 days @ $500/day......................................$ <br />2,250.00 <br />Indian River County 2 12/19/2025 <br />