My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/23/2025
CBCC
>
Meetings
>
2020's
>
2025
>
10/23/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2026 12:08:14 PM
Creation date
1/16/2026 11:21:26 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
10/23/2025
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
building's perimeter. Perimeter buffers may be waived where residential uses within a mixed use P.D. <br />are situated adjacent to similar residential uses located outside the project. <br />Street Network <br />(17) Each mixed use P.D. shall offer alternative routes and connections between destinations within the <br />project, and to appropriate uses on adjacent sites, by designing and constructing a street network that <br />consists of a grid or modified grid pattern and stub -outs or connections to adjacent sites. <br />(18) The project shall contain a network of interconnected streets, sidewalks, and pathways. Streets shall be <br />designed to balance pedestrian and automobile needs, to discourage high automobile speeds, to <br />effectively and efficiently accommodate transit systems, and to distribute and diffuse traffic rather <br />than concentrate it. Sidewalks shall be provided on both sides of project streets. <br />(19) Street trees shall be provided so as to shade sidewalk areas and buffer sidewalk areas from automobile <br />traffic. <br />(20) For a mixed use project located in the SR 60/IRSC preferred location area, the project shall provide the <br />following: <br />a. SR60 access to the IRSC campus in coordination with Indian River State College and County Public <br />Works. <br />b. Access from the IRSC campus to 66th Avenue at 18th Street, including a bridge over the Lateral A <br />Canal, and including 66th Avenue/18th Street signalization, in coordination with Indian River State <br />College and County Public Works. <br />Timing of Construction <br />(21) In each mixed use P.D., not located in the SR 60/IRSC preferred location area, no more than three (3) <br />acres or fifty (50) percent of the total commercial area allowed, whichever is greater, shall be <br />constructed until at least twenty-five (25) percent of the proposed residential development (units or <br />lots) has been constructed, and no certificate of occupancy shall be issued for commercial area <br />exceeding three (3) acres or fifty (50) percent of the total commercial area allowed, whichever is <br />greater, unless at least twenty-five (25) percent of the total residential development has received <br />certificates of occupancy or certificate of completion. <br />(22) For a mixed use PD project located in the SR 60/IRSC preferred location area, no more than fifteen (15) <br />acres not to exceed fifty (50) percent of the total commercial area allowed shall be constructed until: <br />a. The infrastructure items in subsection (20) above have been constructed or designed and <br />committed to via an enforceable developer's agreement, and <br />b. A conceptual or final development plan for the residential development has been approved, and <br />C. The infrastructure that serves the residential portion of the project has been constructed or <br />designed and committed to via an enforceable developer's agreement. <br />(Ord. No. 2012-021, § 1, 7-10-12; Ord. No. 2013-006, § 1, 7-2-13; Ord. No. 2013-021, § 1, 12-10-13; Ord. No. 2017- <br />008, § 1, 7-11-17) <br />Section 915.21. Traditional neighborhood design standards. <br />Traditional neighborhood design (TND) developments over forty (40) acres shall be approved as planned <br />developments. To qualify as a TND development, projects must meet the following criteria: <br />Development Parameters <br />(Supp. No. 151) <br />Page 19 of 29 <br />Created: 2025-06-25 14:39:51 [EST] <br />24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.