Laserfiche WebLink
4. <br />5. <br />BOOK 99 i'#! JE 100 <br />Land Use Designation: L-1, Low Density 1 (up to 3 units per <br />acre) <br />Building Area: Existing: <br />2,473 <br />sq. <br />ft. <br />After Phase I: <br />6,414 <br />sq. <br />ft. <br />After Phase II: <br />11,200 <br />sq. <br />ft. <br />Note: The above figures are cumulative, and Phase II <br />represents the total building area at build -out. <br />Impervious Area: Existing: <br />26,709 <br />sq. <br />ft. <br />After Phase I: <br />37,465 <br />sq. <br />ft. <br />After Phase II: <br />49,719 <br />sq. <br />ft. <br />Note: The above figures are cumulative, and Phase II <br />represents the total impervious area at build -out. <br />6. Open Space: Required: 40% <br />Existing: 75% <br />After Phase I: 59% <br />After Phase II: 47% <br />Note: The above figures represent the total open space on the <br />site per phase and do not reflect any credit for a 5,625 <br />square foot.pond nor the grassed parking area. <br />7. Traffic Circulation: The proposed site plan will not affect <br />the project's 43rd Avenue access. All parking spaces will be <br />accessed from an internal driveway which will access 43rd <br />Avenue. Additional parking and a looped driveway will be <br />provided with Phase II. The access and internal circulation <br />plan has been approved by the County's. Traffic Engineering <br />Division. <br />8. Phasing: The first phase will include a stand alone <br />fellowship building, additional parking and a drainage system <br />to serve the build -out design. <br />The second phase will be an expansion of the Phase I building, <br />additional parking lot area, and some minor drainage <br />conveyance system improvements. Prior to site plan release <br />for Phase II, an administrative approval will be required to <br />finalize the Phase II landscape plan. <br />9. Off -Street Parking: <br />Required Phase I: <br />Provided Phase I: <br />Required Phase II: <br />Provided Phase II: <br />54 spaces (cumulative) <br />55 spaces (cumulative) <br />84 spaces (cumulative) <br />84 spaces (cumulative) <br />10. Stormwater Management: The stormwater management plan has <br />been approved by the public works department, and the <br />applicant will obtain a Type "B" stormwater management permit <br />prior to site plan release. <br />11. Utilities: The site is presently served by county water and <br />an on-site septic system. The site will continue to be served <br />by county water, and a new septic system will be constructed <br />for the expansion. These utility provisions have been <br />approved by the Department of <br />Environmental Health Department. <br />29 <br />DECEMBER 3, 1996 <br />Utility Services and <br />