My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/3/1996
CBCC
>
Meetings
>
1990's
>
1996
>
12/3/1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:06:10 PM
Creation date
6/17/2015 9:12:08 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
12/03/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOOK 99 Fx A041 <br />MOTION WAS MADE by Commissioner Eggert, SECONDED by <br />Commissioner Macht, to approve Amendment No. 4 with <br />Kimley-Horn in the amount of $43,400 and Option No. <br />1, the medians to be landscaped without sod. <br />Under discussion, Commissioner Tippin favored going ahead with <br />the landscaping but preferred using sod instead of pavers (Option <br />2) . <br />COMMISSIONERS EGGERT AND MACHT WITHDREW THEIR MOTION to <br />approve Option 1. <br />Public Works Director Jim Davis explained that staff's <br />recommendation was based on the high traffic environment, the tight <br />right-of-way, and the risk factor encountered during construction. <br />ON MOTION by Commissioner Tippin, SECONDED by <br />Commissioner Ginn, the Board unanimously approved <br />Amendment No. 4 with Kimley-Horn in the amount of <br />$43,400 and Option No. 2, the use of sod. <br />37TH STREET IMPROVEMENTS - U.S.#1 TO I.R. BLVD. - KIMLEY- <br />HORN, AMENDMENT NO. 5 <br />The Board reviewed the following memo dated 11/22/96: <br />TO: James Chandler <br />County Administrator <br />THROUGH. James W. Davis, P.E., <br />Public Works Director <br />FROM: Terry B. Thompson, P.E 7 <br />Capital Projects Manage <br />SUBJECT: Amendment No. 5 <br />?9 <br />Professional Professional Engineering Services <br />37th Street Improvements <br />From US 1 to Indian River Boulevard <br />DATE: November 22, 1996 <br />DESCRIPTION AND CONDITIONS <br />Since the time that plans for 37th Street were completed, three (3) site plans have come <br />in on 37th Street that allow for the installation of sidewalks and the elimination of 406 <br />linear feet of culvert pipe and two (2) structures which will save approximately $18,200.00 <br />irlconstruction costs. <br />DECEMBER 3, 1996 65 <br />E___1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.