My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/21/1997
CBCC
>
Meetings
>
1990's
>
1997
>
1/21/1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:10:02 PM
Creation date
6/17/2015 9:22:38 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
01/21/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COPY OF PARTIALLY EXECUTED RECONCILLIATION OF PURCHASERS' COSTS <br />IS ON FILE IN THE OFFICE OF THE CLERK TO THE BOARD <br />AWAITING FULLY—EXECUTED DOCUMENT FROM DCA <br />COPY OF PARTIALLY EXECUTED GRANT AWARD AGREEMENT <br />IS ON FILE IN THE OFFICE OF THE CLERK TO THE BOARD <br />AWAITING FULLY—EXECUTED DOCUMENT FROM FCT <br />U.S. ARMY CORPS OF ENGINEERS - UPDATE ON HORNED <br />SCULLIES AND UNEXPLODED ORDNANCE <br />(Clerk's Note: When the Chairman called this item, <br />Administrator Chandler informed her that Mr. Bridgers had not <br />arrived from Jacksonville. The Chairman postponed the item to the <br />end of the meeting.) <br />SANDRMGE GOLF CLUB - LATERAL "G" PUMP HOUSE DESIGN <br />SERVICES AMENDMENT No. 1 TO WORK AUTHORIZATION No. 2 - <br />CARTER ASSOCIATES, INC. <br />The Board reviewed a Memorandum of January 15, 1997: <br />TO: James Chandler <br />County Administrator <br />THROUGH: James W. Davis, P.E. <br />Public Works Direct <br />FROM: Terry B. Thompson, RE� <br />Capital Projects Manager <br />SUBJECT: Sandridge Golf Club <br />Lateral 'G' Pump House Design Services <br />Amendment No. 1 to Work Authorization No. 2 <br />DATE: January 15, 1997 <br />Carter Associates, Inc. is under contract with Indian River County to provide professional <br />engineering and construction inspection services for a wastewater transmission system <br />to interconnect the Hobart Road North Regional Wastewater Treatment Plant to the <br />Gifford Wastewater Treatment Plant Included in the project is the installation of a new <br />line from the Lateral 'G' Canal right-of-way to the effluent receiving pond at Sandridge. <br />The Consumptive Use Permit for Sandridge Golf Course requires that the County make <br />an odsting hydraulic pump in the Lateral °G' Canal permanent at its present location. The <br />pump is used to supply water to a Sandridge irrigation lake. To facilitate the construction <br />of this pump house, the Utilities Departrrt is wining to bid this work with the effluent line <br />that is being constructed in the same area. Public Works will administer the design <br />contract with the engineer and Utilities will administer the construction contract in an <br />overall Courrty cooperative effort <br />Attached is Amendment No. 1 to Work Authorization No. 2 for the design of the pump <br />station in the Lateral 'G' Canal. The lump sum fee for design, bidding, construction <br />administration, inspection and surveying is $6,720.00. This added to the current contract <br />amount of $86,715.00, will result in a new contract amount of $93,435.00. <br />Staff recommends that the Board authorize the Chairman to sign the attached Amendment <br />No. 1 to Work Authorization No. 2. Funding is from Sandridge Enterprise Fund. <br />59 <br />January 21 1997 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.