My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/21/1997
CBCC
>
Meetings
>
1990's
>
1997
>
1/21/1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:10:02 PM
Creation date
6/17/2015 9:22:38 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
01/21/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MOTION WAS MADE by Commissioner Adams, SECONDED by <br />Commissioner Ginn, to authorize the Chairman to sign <br />the agreement with Masteller & Moler, Inc. for a <br />total of $471,500, as recommended in the Memorandum. <br />Under discussion, Commissioner Ginn commented that she found <br />it interesting that design engineering cost so much more than the <br />construction, and County Engineer Roger Cain explained that the <br />amount mentioned for construction is for one year only and this <br />will be a multi-year project. The construction will end up costing <br />about $2.5 to $3 million for the whole thing. <br />THE CHAIRMAN CALLED THE QUESTION and the motion <br />carried unanimously. <br />Former County Commissioner Maggy Bowman suggested that if the <br />widening does occur that it should be on the south side which has <br />already been cleared, instead of the north side in order to <br />preserve the beautiful hammock area. Mr. Cain advised that he did <br />not know exactly where the widening will occur, but that <br />consideration would be given to her suggestion. <br />Commissioner Adams and Chairman Eggert concurred with Ms. <br />Bowman's suggestion. <br />PROFESSIONAL ENGINEERING SERVICES AGREEMENT IS ON FILE <br />IN THE OFFICE OF THE CLERK TO THE BOARD <br />PURCHASE BIOFILTRATION UNU FOR BAILEY DRIVE REPUMP <br />STATION, SEBASTIAN HIGHLANDS - EG&G BIOFILTRATION <br />The Board reviewed a Memorandum of January 13, 1997: <br />DATE: JANUARY 139 1997 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATOFJ <br />FROM: TERRANCE G. tIN*iRVICESDIRECTOR OF <br />PREPARED GENE A. RAUTHgAle,�` <br />AND STAFFED BY: MANAGER OF WATER / WASTEWATER OPERATIONS <br />SUBJECT: PURCHASE OF BIOFILTRATION UNIT FOR BAILEY <br />DRIVE - REPUMP STATION, SEBASTIAN HIGHLANDS <br />61 <br />January 21, 1997 <br />�o� B <br />ROOK'E ►J• <br />
The URL can be used to link to this page
Your browser does not support the video tag.