Laserfiche WebLink
the units affordable for a 15 year period. For rental <br />projects such as this one, "affordable" is defined in the <br />county's LDRs as a unit having a monthly rental rate equal to <br />.083 times 20% of the non -adjusted annual median family income <br />for Indian River County as established by the FHFA. <br />Satisfaction of the tax credit program requirements will <br />satisfy county affordable housing density bonus requirements. <br />Based on the proposed PD and proposed program participation, <br />staff has determined that the applicant meets county <br />requirements for a 20% affordable housing density bonus, <br />although a 10% density bonus is being requested. To ensure <br />that these requirements will be met, the applicant will need <br />to provide the county with a letter from the state or federal <br />agency responsible for funding and monitoring the project <br />under the tax credit program. In addition, the LDRs require <br />the applicant to record a restrictive covenant that specifies <br />the terms of the affordable housing approval, and places any <br />prospective buyer of the project on notice as to the terms of <br />approval. <br />8. New Impervious Surface Area: Phase I: 4.76 acres <br />Phase II: 5.34 acres <br />Total: 10.10 acres <br />9. Open Space: Required: RM -10: 30.0% <br />Provided: Phase I: 50.6% <br />Phase II: 58.4% <br />Both Phases at Buildout: 55.1% <br />Note: Since the area of development is entirely within the <br />RM -10 zoning district, the RM -10 open space criteria of 30% <br />was applied to the site. The RS -1 portion of the site will be <br />left undeveloped, providing 100% of the area as green open <br />space. <br />10. Recreation Area: <br />Required: Phase I: 1.73 acres <br />Provided: Phase I: 1.73 acres <br />Required: Phase II: 1.92 acres <br />Provided: Phase II: 2.40 acres <br />Both Phases at Buildout Required: 3.65 acres <br />Both Phases at Buildout Provided: 4.13 acres <br />11. Traffic: The project will be accessed from Indian River <br />Boulevard with a driveway that will align with 8th Street and <br />straddle the boundary between the project site and the site <br />immediately north. This driveway alignment is dependent upon <br />the applicant securing an easement from the property owner to <br />the north prior to PD plan release. If the easement is not <br />secured, the applicant will need to redesign the project <br />access with a right-in/right-out driveway located in the <br />middle of the property, at least 175' from the intersection of <br />8th Street and Indian River Boulevard. <br />Within the project site, an internal loop road is proposed to <br />service Phase I. The road will loop through the site and <br />provide access to various parking areas that will serve the <br />apartment buildings. From Phase I, the loop road will stub - <br />out to a loop road for Phase II, which will provide access to <br />the buildings within Phase II. - <br />24 <br />JANUARY 28, 1997 e00K � 0" 0 FACE J3 <br />M M M <br />