My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/28/1997
CBCC
>
Meetings
>
1990's
>
1997
>
1/28/1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:10:02 PM
Creation date
6/17/2015 9:23:44 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Special Call Meeting
Document Type
Minutes
Meeting Date
01/28/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEVELOPER'S AGREEMENT FOR SEWER PROTECT - SCHOMIVV�R <br />The Board reviewed the following memo dated 1/15/97: <br />DATE: JANUARY 15, 1997 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />FROM: TERRANCE G. PINTO <br />DIRECTOR OF UTILITY SERVICES <br />PREPARED MICHAEL C. HOTCHKISS, P.E. 09 <br />AND STAFFED ENVIRONMENTAL ENGINEER <br />BY: DEPARTMENT OF UTILITY SERVICES <br />SUBJECT: DEVELOPER'S AGREEMENT FOR SCHOMMER PROPERTY <br />SEWER PROJECT IN SEBASTIAN <br />INDIAN RIVER COUNTY PROJECT NO. CCS/615 <br />BACKGROUND <br />Alan Schommer and Katherine P. Siebert have requested that Indian <br />River County Utilities provide sewer service to their property <br />located along Indian River Drive, north of Martin Avenue, in <br />Sebastian. Initially, Washington Plaza (located on the Schommer <br />parcel) will connect to water and sewer. Mr. Schommer has agreed <br />to have the necessary facilities constructed and dedicated to the <br />County through a Developer's Agreement (see attached Developer's <br />Agreement). <br />ANALYSIS <br />This agreement will provide a lift station adequately sized to <br />serve the area adjacent to the collection system designated as <br />"Phase 1" and "Phase 2" shown on Exhibit A of the attached <br />Developer's Agreement. The "Phase 1" gravity sewer main, <br />consisting of 795 feet of 8" PVC pipe, will also be constructed <br />along Indian River Drive, north and south of the lift station. <br />Implementation of this Developer's Agreement will provide gravity <br />sewer service to 11 parcels of land, initially, with an additional <br />30 parcels to be served upon extension of the "Phase 2" gravity <br />lines (see attached Cost Sharing Analysis). Construction of this <br />project enables future restaurants and businesses to be in <br />conformance with Environmental Health's requirement that all <br />commercial developments along the Indian River connect to County <br />sewer. <br />Money for over -sizing of the lift station and construction of the <br />"Phase 1" collection system will be recovered in the future as <br />adjacent properties connect. For details of the cost sharing, see <br />Exhibit A, Exhibit B and the Cost Sharing Analysis table. The <br />total estimated project cost is $135,600.00. The County's portion <br />will not exceed $122,817.48 (see attached Developer's Agreement). <br />Funding for this project will be paid, temporarily from the impact <br />51 <br />JANUARY 289 1997 <br />BOOK UO PAGE 41 <br />
The URL can be used to link to this page
Your browser does not support the video tag.