Laserfiche WebLink
Due to the young age of the Roseland elevated tank, the staff has analyzed and adjusted the <br />maintenance cost of both the historical and proposed, to be the same as the Kings Highway <br />elevated tank. This assumption is based on the similarity of the two elevated tanks (same <br />manufacture, size, physical, operating, and environmental characteristics). With the adjusted cost <br />considered for the Roseland tank and the present method of performing tank maintenance, the <br />adjusted historical yearly average for each tank is as follows: <br />GIFFORD <br />KINGS HIGHWAY <br />ROSELAND <br />TOTAL <br />$19,930.00 / YR <br />$13,009.00 / YR <br />$13009.00 / YR <br />$45,948.00 / YR <br />Under the present method of in-house tank maintenance an escalating cost trend is occuring. <br />This is best seen in the Gifford elevated water storage tank by looking at both the time period <br />between major repairs and the yearly average costs. <br />TIME PERIOD BETWEEN YEARS TOTAL COST DURING YEARLY <br />MAJOR REPAIRS TIME PERIOD AVG COST <br />1987-1992 <br />1993-1997 <br />6YRS $92,252.00 <br />5 YRS $105,156.00 <br />$15,373.00 <br />$21,031.00 <br />As can be seen by the Gifford elevated tank's data, the time period between major repairs is <br />decreasing while the cost of maintaining the Gifford elevated tank is increasing. To address this <br />trend the staff has put these costs into perspective. The staff has analyzed the ongoing and <br />projected maintenance costs by evaluating the elevated storage tanks over a six year maintenance <br />cycle. With this methodology the proposed average yearly cost for maintaining each of the three <br />tanks would be as follows: <br />GIFFORD <br />$12,578.00 / YR <br />KINGS HIGHWAY <br />$23,855.00 / YR <br />ROSELAND <br />$23.855.00/ YR <br />TOTAL <br />$60,288.00 / YR <br />As shown on each of the three Tank Maintenance Analysis Worksheets, a cost savings to Indian <br />River County could be realized if the proposed six year maintenance cycle were to be contracted <br />out, as is the staff's intention. The average yearly cost for each of the County's three elevated <br />tanks would be as follows: <br />GIFFORD <br />KINGS HIGHWAY <br />ROSELAND <br />TOTAL <br />$11,236.00 / YR <br />$15,275.00/ YR <br />$15275.00/ YR <br />$41,786.00/ YR <br />This would result in an average yearly cost savings of $18,502.00. <br />(60,288.00 minus 41,786.00 = 18,502.00) <br />There are many benefits to using this type of system for tank maintenance. The staff of the <br />Department of Utility Services seeks approval of the three maintenance contracts for the County's <br />three elevated water storage tanks, and approval of the fourth contract for immediate tank repairs <br />to the Gifford tank at a cost of $85,873.00, as was included in the original RFP as a direct price <br />quote. <br />The staff of the Department of Utility Services recommends that the Board of County <br />Commissioners approve and execute the attached contracts with Utility Service Company, Inc. <br />as presented. <br />55 <br />JANUARY 28, 1997 <br />A <br />