My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2/11/1997
CBCC
>
Meetings
>
1990's
>
1997
>
2/11/1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:10:02 PM
Creation date
6/17/2015 9:26:56 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
02/11/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
construction of a water main on Jungle Trail as part of the <br />infrastructure to take the plant off line. Please reference the <br />attached copy of their report. <br />In 1996, the Board of County Commissioners awarded the construction <br />of a water main across to the beach from a feed line on the <br />mainland and allowing the North Beach plant to be converted to a <br />repump facility. The Utilities Department is now prepared to begin <br />with the plant decommission. This will involve two contracts; one <br />for project design, construction and inspection. The second <br />contract will be for financial analysis of the project. <br />ANALYSIS <br />The Utility Department staff has completed the Competitive <br />Consultants Negotiation Act (CCNA) process to select an engineering <br />firm to design the repump facility and decommission the plant. The <br />firms that gave presentations are as follows: <br />1. Carter Associates, Inc. <br />2. Brown and Caldwell <br />3. Malcolm Pirnie <br />4. Camp Dresser and McKee, Inc. <br />The ranking is as follows: <br />1. Camp Dresser and McKee, Inc. <br />2. Brown and Caldwell <br />3. Malcolm Pirnie <br />4. Carter Associates, Inc. <br />On November 12, 1996, the Board of County Commissioners approved <br />Brown and Caldwell as our Master Plan Continuing Services Engineer, <br />(See attached Agenda and contract) which included financial <br />analysis work as well. We wish to negotiate a Work Authorization <br />with Brown and Caldwell to provide a financial analysis of the <br />project to determine funding sources and substantiate the projects <br />financial viability. <br />RECOMMENDATION <br />The staff of the Department of Utility Services recommends approval <br />of the first ranked firm, Camp Dresser and McKee, and to authorize <br />the staff to begin contract negotiations for the project as <br />outlined above with Camp Dressed and McKee and Brown and Caldwell. <br />Commissioner Adams expressed her concern that some of these <br />contracts might be favorable to the firm to which one of our former <br />employees moved last fall (former Assistant Utilities Director <br />Harry Asher moved to Brown and Caldwell). <br />Utilities Director Terry Pinto explained that the contract <br />actually will enhance what they are doing for us. Our contract <br />goes way beyond the time when Mr. Asher went with them. He assured <br />the Board that Mr. Asher's working for them now has no credence in <br />why we are working with them. <br />Chairman Eggert felt she would agree if this had come up just <br />since Mr. Asher has been with Brown & Caldwell, but these contracts <br />have been ongoing for a long time, back to 1992. <br />FEBRUARY 11, 1997 51 BOOK FADE u , <br />J <br />
The URL can be used to link to this page
Your browser does not support the video tag.