My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/4/1997
CBCC
>
Meetings
>
1990's
>
1997
>
3/4/1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:10:02 PM
Creation date
6/17/2015 9:49:43 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
03/04/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
William Koolage, a resident since 1971, was very discouraged <br />to hear the Board is going to allow property owners to put money <br />into saving the beach. He felt that jetties such as the one at <br />Sebastian would stop the sand movement out to sea. He did not <br />believe that a seawall is an obstruction to the sand moving and <br />believed it is time to take another look at the situation. <br />Director Davis responded that attempts to capture sand in the <br />Vero Beach area are complicated by the hard bottom which exists. <br />After a recent study was completed, it was found that environmental <br />considerations were overwhelming and the costs were well over 10 <br />million dollars. <br />ON MOTION by Commissioner Adams, SECONDED by <br />Commissioner Tippin, the Board by a 4-0 vote <br />(Commissioner Macht being absent) approved the <br />issuance of the F.S. Chapter 161.085(3) Emergency <br />Permits for the Millar and Somoza properties, <br />subject to the conditions set forth in staff's <br />memorandum, with the addition of language to <br />Condition 2 as follows: "The seawall be placed as <br />landward as possible, in accordance with the Mosby <br />drawing submitted as back-up this date." <br />FOLLOW-UP ON CONTRACT/AGREEMENT FOR REPAIRS TO <br />WABASSO BEACH PARK FOLLOWING CONSTRUCTION OF <br />SilMARRPLACE SEAWALL <br />The Board reviewed a Memorandum of February 26, 1997: <br />TO: James E. Chandler, <br />County Administrator <br />THROUGH: James W. Davis. P.E., <br />Public Works Director <br />FROM: Jeffrey R. Tabar, Coastal Engineer <br />SUBJECT: Follow -Up on Contract/Agreement for Repairs to <br />Wabasso Beach Park Following the Construction <br />of the Summerplace Seawall <br />REF. LETTER: 1) Wm. Glynn to J. Davis dated 02/19/97 <br />2) Charlie Cangianelli to J. Davis dated 02/20/96 <br />DATE: February 26, 1997 <br />DESCRIPTION AND CONDITIONS <br />On January 28, 1997, the Board of County Commissioners approved the request for an <br />"emergency permit" along six (6) properties in Summerplace Subdivision. The property <br />owners have requested the use of Wabasso Beach Park as a staging and access area <br />during the construction of the seawall. The Board has requested that staff look into the <br />repairs of the park from the first phase of homeowners before allowing the second phase <br />to continue using the park. <br />MARCH 49 1997 35 <br />6UUK ( AGC- UJ <br />
The URL can be used to link to this page
Your browser does not support the video tag.