Laserfiche WebLink
Fr- <br />BOOK 100 PAGE 967 <br />1. Size of Area to be <br />Redesignated: <br />*101.8 acres <br />2. Existing Land Use Designation: 172.3 acres of M-1, <br />M e d i u m- D e n s i t y <br />Residential -1 (up to 8 <br />units/acre) and 129.5 <br />acres of AG -2, <br />Agricultural -2 (up to 1 <br />unit/10 acres) <br />3. Proposed Land Use Designation: C/117 <br />/ 117 rial Nocomm e r c i a 1 - <br />4. Most Intense Use of Subject <br />Property under Current 580 Dwelling Units <br />Land Use Designation: <br />5. Most Intense Use of Subject Property under Proposed Land Use <br />Designation: 101.8 acres of Industrial <br />- Transportation <br />A review of the traffic impacts that would result from industrial <br />development on Subject Property 1 indicates that the existing level <br />of service (LOS) "C" or better on SR 60, from 100th Avenue to I-95, <br />and "D" or better on other impacted roads would not be lowered. <br />Because it is part of the Florida Intrastate Highway System, state <br />regulations require that LOS "C" be maintained on that portion of <br />State Road 60. The site information used for determining traffic <br />impacts is as follows: <br />Existing Land Use Designation <br />1. Residential Use Identified in 5th Edition ITE Manual: <br />Single -Family <br />2. For Single -Family Units in 5th Edition ITE Manual: <br />a. Average Weekday Trip Ends: 10.1/unit <br />b. P.M. Peak Hour Trip Ends: 1.01/unit <br />C. Inbound (P.M. Peak Hour). 65% <br />i. Eastbound (P.M. Peak Hour): 51% <br />ii. Westbound (P.M: -Peak Hour): 49% <br />d. Outbound (P.M. Peak Hour): 35% <br />i. Eastbound (P.M. Peak Hour): 49% <br />ii. Westbound (P.M. Peak Hour): 51% <br />3. Peak Direction of SR 60, from 100th Avenue to I-95: Eastbound <br />4. Formula for Determining Number of Peak Hour/Peak Season/Peak <br />Direction Trips Generated: Number of Units 8 P.M. Peak Hour <br />Rate 8 Inbound P.M. Percentage S Inbound -Eastbound Percentage <br />(3 80 8 1.01 S .65 g .51 = 194) <br />5. Formula for Determining Number of Average Weekday Trips <br />Generated: Number of Units 8 Average Weekday Rate <br />(580 8 10.1 0 5,858) <br />Proposed Land Use Designation <br />1. Use Identified in 5th Edition ITE Manual: Industrial <br />2. For 101.8 acre Industrial Developments in 5th Edition ITE <br />Manual: <br />a. Average Weekday Trip Ends: 6.75/acre <br />b. P.M. Peak Hour Trip Ends: 2.16/acre <br />C. Inbound (P.M. Peak Hour): 50$ <br />i. Eastbound (P.M. Peak Hour): 51$ <br />ii. Westbound (P.M. Peak Hour): 49% <br />d. Outbound (P.M. Peak Hour): 50% <br />i. Eastbound (P.M. Peak Hour): 49% <br />ii. Westbound (P.M. Peak Hour): 51% <br />3. Peak Direction of SR 60, from 100th Avenue to I-95: Eastbound <br />4. Formula for Determining Number of Peak Hour/Peak Season/Peak <br />Direction Trips Generated: Total Acreage % P.M. Peak Hour Rate <br />% Inbound P.M. Percentage B Inbound -Eastbound Percentage <br />(101.8 acres B 2.16/acre B .5 B .51 • 56) <br />MARCH 18, 1997 <br />94 <br />s <br />