My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/22/1997
CBCC
>
Meetings
>
1990's
>
1997
>
4/22/1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:10:04 PM
Creation date
6/17/2015 10:04:49 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
04/22/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Chairman opened the public hearing and asked if anyone wished to be heard in this matter. <br />There being none, she closed the public hearing. <br />Commissioner Adams asked if it is anticipated that 49th Street would be paved in the future. <br />Director Boling explained that, outside the urban service area, the standard for low traffic -generating <br />project is 100 trips or less. As this project falls under that standard, there would be no paving <br />requirement. He guessed that 40 Street would not be programmed for improvements until such time <br />as the urban service area boundaries expanded to include it. <br />ON MOTION by Commissioner Ginn, SECONDED by Commissioner Tippin, <br />the Board unanimously (4-0, Commissioner Macht being absent) approved <br />staffs recommendation as set forth in the Memorandum. <br />9.B.1. F.D.R. TOMEY - LANDFILL FEES <br />The Board reviewed a Memorandum of February 6, 1997, and letter ofFebruary 14, 1997: <br />DATE: FEBRUARY 6, 1997' <br />TO: RONALD R.. BROOKS,. MANAGER <br />SOLID WASTE DISPOSAL DISTRICT <br />FROM; • • .. JOYCE •A. W1 XEL <br />S0136 WAS7E DW. AL DISTRICT - <br />SUBJEM --SWDO.FEE LNFORMATION FROM JANUARY.26, 1997 <br />The transactions. for 3anuary 26, F997; in M. vmg an uncovered load upping fee and .two <br />construction,.tippinglee transaction •one for contaminated concrete $30:00 per ton and <br />one for-clean.00ncreW.$3.W.w tom; _. . <br />VA= :.'this gwd man _ entered .the; Landfill : on ,Ugday, -his trailer . containing the <br />contaminated: concreted was . not. covered:: The -inbound zcale:operaW explained to him <br />that all hm4coming ittto the"latidfilt hadao be coiered or pay a W.00 uncovered load <br />tipping" fox: Tlie opetatoi. ako `informed: km, tht: material: would .be chased at $30.00 <br />Per ton. The -gentleman did not agree to the charges. The scale operator had the <br />gentleman putt-off.thescale.and called the:•supervisor to -inspect, the concrete to verify <br />the tipping.fee.would•bG=S30.0fl:pet.ton" Mi: Stwe Brittingham.in3pected the concrete <br />and •determiitoei. tbo :tipping fee: -would be-$30.00.:per ton... Mr. Brittirtigham also gave <br />the gentleman $ han&.out on 16imcovar�bads and- Ithink he.also -gave the gentleman <br />a copy of:the tipping fees `At. ttiis point ft genoeman. left. the ImuMl without dumping <br />the material. <br />Within wtbe hour :Yhe` :getkmau i rdnd : to: :ilii:: }andflll.:.Agaia his load was not <br />covered. The'inbound . sc "opeiami =&=ted � the"• uncovered load; tipping fee of <br />$25.00,. and reminded,. him; -of :the_430.00 per ton dpp*.. fee for his material. The <br />gentleman paid:146.,8040r. his_ anaterial:: Tha gendentaa retanted a second time, his <br />Load covered this time ,:with-cte2n-co =tn; cleats:conet+ete has.tipping fee of $3.00 per <br />ton with a 53.00 n1ui =' tint, ., -Lars: sii and load tots W13.00. ' <br />I'have• attached copies.9f.a 11.he transactions. <br />23 <br />-c, lr 10 -1 - <br />�, ". I FA, � E Z J 11 <br />April 22, 1997 <br />
The URL can be used to link to this page
Your browser does not support the video tag.