My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/20/1997
CBCC
>
Meetings
>
1990's
>
1997
>
5/20/1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:10:04 PM
Creation date
6/17/2015 10:09:17 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
05/20/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2520.16 $20.21 $50,932.43 $50,932.43 <br />TOTAL FRONT COST PER F. F. TOTAL COST TOTAL ASSESSMENT <br />FOOTAGE <br />O <br />N <br />60avpre.wkl P9_p, <br />6 �N'� <br />a� <br />PRELIMINARY ASSESSMENT ROLL FOR PAVING AND DRAINAGE IMPROVEMENTS TO: <br />60TH AVENUE SOUTH OF 45TH STREET IN PONDEROSA ESTATES-� <br />TOTAL FRONT FEET.......... <br />2520.16 <br />COST TO PROPERTY OWNERS... <br />$50,932.43 <br />PROJECT NO.9536 COST PER FRONT FOOT .... S <br />$20.21 <br />FRONT <br />TOTAL <br />NAME & ADDRESS LEGAL DESCRIPTION FOOTAGE COST/F.F. TOTAL COST <br />ASSESSMENT COST <br />16. Jeffrey Craig & Kimberly Morgan 29 32 39 00003 0000 00020.0 124.70 $20.21 $2,520.19 <br />$2.520.19 <br />4365 60th Avenue Ponderosa Estates Unit I PBI 6181 <br />Vero Beach, FL 32967 Lot 20 Less S 20 Ft & S 54.9 Ft of Lot <br />21 (OR Bk 443 PP 814) <br />17. Gary Farless 29 32 39 00003 0000 00021.0 214.50 $20.21 $4,335.04 <br />$4,335.04 <br />4445 60th Avenue Ponderosa Estates Unit I PBI 6)81 <br />Vero Beach, FL 32967 N 34.90 Ft of Lot 21 & All of Lots 22 <br />& 23 (OR Bk 484 PP 873) <br />18. Bruce G. & Valerie Kennison 29 32 39 00003 0000 00024.0 149.92 $20.21 $3,029.88 <br />$3,029.88 <br />4451 601h Avenue Ponderosa Estates Unit 1 PBI 6181 <br />Vero Beach, FL 32967 Lot 24 & S 60.4 Ft of Lot 25 (OR Bk <br />399 PP 664) <br />M <br />2520.16 $20.21 $50,932.43 $50,932.43 <br />TOTAL FRONT COST PER F. F. TOTAL COST TOTAL ASSESSMENT <br />FOOTAGE <br />O <br />N <br />60avpre.wkl P9_p, <br />
The URL can be used to link to this page
Your browser does not support the video tag.