My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/24/1997
CBCC
>
Meetings
>
1990's
>
1997
>
6/24/1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:10:05 PM
Creation date
6/17/2015 10:13:57 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
06/24/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ANALYSIS <br />The agreements state that the Indian River County Department of <br />Utility Services (IRCDUS) shall provide water service to Mr. and <br />Mrs. Harwell, Mr. and Mrs. Scott, and Mr. and Mrs. Feek. The <br />parties agree to pay all fees required for construction and <br />connection to serve their respective properties. The Department <br />proposes to construct the project utilizing the labor contract <br />(Driveways, Inc.) at the cost of $4,971.45 and purchase materials <br />under the materials bid with US Filter Distribution Group at the <br />cost of $2,496.04, for a total estimated project cost of $7,467.49 <br />(see attached) and the proportionate share for the owners. <br />Of the seven (7) property owners on this street, only the above <br />three (3) owners have requested this service. These properties are <br />located in the Forest Lake Subdivision, which contains 38 lots that <br />are typically .50 acre(±). The subdivision abuts the west side of <br />43rd Avenue. Four (4) of the properties are presently on County <br />water and have signed agreements to participate in and be included <br />in a future water assessment project for the subdivision. Over the <br />last few years, petitioners have been unable to obtain sufficient <br />signatures supporting a water assessment project. <br />RECON MMMATION <br />The Department of Utility Services recommends that the Board of <br />County Commissioners approve the attached agreements, and upon <br />receipt of funds from participants, authorize the construction of <br />the project under the attached Work Authorization with Driveways, <br />Inc., and purchase of materials under the County bid with US Filter <br />Distribution Group. <br />ON MOTION by Commissioner Adams, SECONDED BY Commissioner <br />Ginn, the Board unanimously approved the agreements submitted; upon <br />receipt of funds from participants, authorized the construction of the <br />project under the Work Authorization with Driveways, Inc.; and <br />authorized the purchase of materials under County bid with US Filter <br />Distribution Group, as recommended in the Memorandum. <br />WORK AUTHORIZATION AND <br />AGREEMENTS (3) ARE ON FILE IN THE <br />OFFICE OF THE CLERK TO THE BOARD <br />17 2 11 rAGE � <br />JUNE 249 1997 <br />el C. <br />
The URL can be used to link to this page
Your browser does not support the video tag.