My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/22/1997
CBCC
>
Meetings
>
1990's
>
1997
>
7/22/1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:10:05 PM
Creation date
6/17/2015 10:02:56 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
07/22/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
500K 102 PAGE 139 <br />The low bidder erred by including $82,007.00 in the mobilization <br />item of their bid. The contract documents allow for a maximum <br />mobilization of $30,000.00 for a project in this range. Staff has <br />performed an extensive reference check on this contractor <br />(Underground Industries, Inc.). All references checked, both <br />supplied by the contractor and solicited outside by staff, and have <br />been excellent as has the review of the company's financial <br />statement. In order to award to this firm, the mobilization cost <br />must be reduced to the allowable amount of $30,000.00. If this <br />figure was reduced by the $52,007.00, the contract amount would be, <br />in the staff's opinion, too low to guarantee successful <br />construction. Staff, therefore, recommends the following: <br />1. Modification of the firm's bid; i.e., set original <br />mobilization at $30,000.00. <br />2. Allow the contractor to bill for one-half of the remaining <br />mobilization overage of $52,007.00 at the 50% completion point <br />in the project and 50% upon final completion of the project. <br />3. Award Bid No. 7058 to Underground Industries, Inc., in the <br />amount of $788,000.00 with the above -outlined provisions and <br />authorize the chairman to execute same when bonds and <br />insurance have been received. <br />If you require any additional information or have any questions <br />with regard to this matter, please do not hesitate to contact me at <br />770-5325. <br />DATE: July 14, 1997 <br />TO: BOARD OF COUNTY COMMISSIONERS <br />THRU: James E. Chandler, County Administrator <br />H. T. "Sonny' Dean, Directo <br />General Services <br />FROM: Fran Boynton Powell, Purchasing Manager <br />SUBJ: Award Bid #7058/North County Reverse Osmosis Brine line <br />Construction <br />Utilities Department <br />BACKGROUND INFORMATION: <br />Bid Opening Date: <br />Advertising Dates: <br />Advertisement Mailed to: <br />Replies: <br />JULY 22,1997 <br />June 12, 1997 <br />May 21, 28, June 4, 1997 <br />Thirty -Three (33) Vendors <br />Ten (10) Vendors <br />kIR <br />
The URL can be used to link to this page
Your browser does not support the video tag.