My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/22/1997
CBCC
>
Meetings
>
1990's
>
1997
>
7/22/1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:10:05 PM
Creation date
6/17/2015 10:02:56 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
07/22/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VENDOR BID TOTAL <br />V ENDOR <br />BID TOTAL <br />Underground Ind. $ 788,000.00 All American Concrete $ 869,871.10 <br />West Palm Beach St Petersburg <br />Maxwell Cont. $ 793,000.00 Martin Paving $ 923,636.00 <br />Cocoa Vero Beach <br />Sheltra & Son $ 810,669.40 Strickler Brothers $ 926,529.00 <br />Indiantown Ft Myers <br />Johnston -Davis $ 842,709.00 Driveways $ 991,510.30 <br />Lantana Titusville <br />Derrico Const. $844,441.00 JoBear $1,077,843.00 <br />Melbourne Palm Bay <br />TOTAL AMOUNT OF BID $788,000.00 <br />SOURCE OF FUNDS 1996 Utilities Bond Construction Fund: <br />( 475-000-169-247-00) <br />ESTIMATED BUDGET $820,000.00 <br />RECOMMENDATION <br />Staff recommends that the bid be awarded to Underground Industries <br />as the lowest, most responsive and responsible bidder meeting <br />specifications as set forth in the Invitation to Bid. (See Department <br />Memo). <br />In addition, staff requests Board approval of the attached Contract as to <br />form, when all requirements are met and approved by the County <br />Attorney. ' &� �..J/�'�x�.c.et <br />In response to Commissioner Adams' inquiry concerning mobilization costs, Capital <br />Projects Engineer William F. McCain explained that this has occurred in the past where the <br />bidder made an error and placed too much of his bid into the mobilization costs. If staff believed <br />they were the responsible/best/lowest bidder for the job, adjustments have been made, with the <br />Board's concurrence, to spread that amount over the period of the contract, so they do not get a <br />large chunk up from. The contract documents are not very clear, allowing for some flexibility. <br />The intent in restricting a large payment up front is so the contractor cannot collect a huge sum, <br />default, and walk off the job. Staff proposes that the amount be spread over the job. He had <br />checked their references and felt the County should be able to save the money and go with the <br />low bidder. <br />ON MOTION by Commissioner Macht, SECONDED BY <br />Commissioner Ginn, the Board unanimously awarded the bid to <br />Underground Industries in the amount of $788,000, as <br />recommended in the Memorandum. <br />37 <br />�,oA/�/R AC 1 o 6 i L - �' � �� sonK 102 PAGE 140 <br />JULY 22,1997 <br />
The URL can be used to link to this page
Your browser does not support the video tag.