My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/7/1997
CBCC
>
Meetings
>
1990's
>
1997
>
10/7/1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:10:20 PM
Creation date
6/17/2015 10:15:13 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
10/07/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The county traffic engineer has approved the principal and emergency site access points, the <br />on-site traffic circulation plan, and the findings of the traffic impact analysis. Therefore, the <br />county traffic engineer has no objection to approval of the conceptual PD special exception <br />use application, provided the previously described turn lane design and installation conditions <br />are required as part of conceptual plan approval. <br />10. Stormwater Management. The public works department has reviewed and approved the <br />stormwater management plan. The applicant will obtain a Type "A" stormwater management <br />permit as part of the LDP or LDP waiver. <br />11. Utilities: The proposed development will be serviced by County Department of Utility <br />Services for both water and wastewater services. Connection to these services has been <br />approved by both the County Department of Utility Services and Environmental Health <br />Department. <br />12. Concurrency: A conditional concurrency certificate has been issued for the project. Thus, <br />all concurrency requirements related to conceptual site plan and special exception use <br />approval have been satisfied. <br />13. Environmental Issues: <br />-Uplands: The project is greater than 5 acres and, therefore, is subject to the native upland <br />set-aside provisions of LDR section 929.05. Environmental planning staff has determined that <br />native upland habitats currently exist on the site. Therefore, the project is required to provide <br />for the preservation of native upland habitat pursuant to provisions of the land development <br />regulations which: <br />a. Requires preservation of a minimum of 15% of the total cumulative acreage of native <br />plan communities which occur on site. <br />b. Allows for the reduction of the minimum area of preservation to 109/6 of the area to <br />be preserved if established in a contiguous area approved by the environmental <br />planning staff. <br />C. Allows for payment of a fee equivalent to the average assessed value of an acre of the <br />particular habitat type under consideration multiplied by the number of acres of <br />habitat equivalent to the 15% area that would otherwise have been set aside. <br />The developer/applicant must satisfy the project's native upland preservation requirements <br />by one or a combination of the above provisions of section 929.05. Prior to issuance of an <br />LDP or LDP waiver, the applicant must identify the method by which native upland <br />preservation requirements are to be satisfied. The conceptual plan depicts a <br />conservation/buffer area along the project's east side, which is acceptable to environmental <br />planning staff. <br />• Wetlands: A wetland area has been identified adjacent to an existing small lake in the <br />approximate center of the site. The exact extent of wetlands has yet to be determined by the <br />St. Johns River Water Management District and/or A.C.O.E. <br />Development of the site will impact the identified wetlands, but the impacts can be mitigated. <br />To mitigate the impacts, the applicant proposes to establish wetlands in the form of littoral <br />zones around the proposed stormwater management lake. The county environmental <br />planning staff has no objection to such mitigation measures or to the proposed conceptual PD <br />Plan. The design of the littoral zone plantings and mitigation will need to be finalized during <br />review and approval of the county's wetland resource permit for the project. Prior to the <br />issuance of a land development permit (LDP) or LDP waiver, the applicant must obtain a <br />county wetland resource permit, as well as applicable environmental permits from <br />jurisdictional agencies. <br />14. Dedications and Improvements: The existing right-of-way width for 49th Street (Lindsey <br />Road) and 47th Street both satisfy current and future right-of-way standards. Therefore, no <br />additional road right-of-way is required or needed from the site. <br />For planned development (PD) projects in the RM -10 zoning district, required improvements <br />may include bikeways, sidewalks, and streetlighting. The following are required for this <br />project: <br />a. Since the project's density exceeds 3 units per acre, the project is required to provide <br />internal sidewalks within the project. Sidewalks providing such access are depicted <br />on the conceptual plan. <br />OCTOBER 7, 1997 <br />
The URL can be used to link to this page
Your browser does not support the video tag.