My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/5/1997
CBCC
>
Meetings
>
1990's
>
1997
>
11/5/1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:10:20 PM
Creation date
6/17/2015 10:23:23 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Special Call Meeting
Document Type
Minutes
Meeting Date
11/05/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OUR APPROACH <br />In order to address your specific requirements with regard to rate structure, specifically ERU <br />assignments for land uses, and the subsequent analyses that may be required, depending upon the <br />results of the rate structure analysis, our approach to this project will include three phases. <br />Phase I - Review Background Data and Evaluate the Fairness and Equitv of the County's <br />Current Equivalent Residential Unit (ERV) Land Use Assignment Chart <br />In Phase I, we will review relevant background information and data and will directly address <br />the County's concerns regarding the fairness and equity of the current ERU Land Use Assignment <br />Chart. Although we will review the process of determining appropriate ERU assignments in general <br />and for all land uses, we will specifically address the concerns regarding the allegation by certain per - <br />manufactured and mobile home customers that an ERU assignment of 1 ERU exceeds the ERU <br />assignment that would be justified by their water usage. We will base our conclusions and <br />recommendations upon analysis of usage by land use type within the County from County billing <br />records, authoritative research on ERU assignment and standards adopted and/or recommended by <br />agencies such as the Florida Department of Environmental Protection, the State Health Department <br />and others identified during the course of the study. <br />Phase II - Develop a Conceptual Design of the Water and Wastewater Rate Systems <br />In Phase II, if authorized based upon the results of Phase I, we will develop a conceptual <br />design of the utility rate systems for the aforementioned County utilities. This conceptual design will <br />consist of 1) the conduct of a revenue sufficiency analysis and the development of a five year rate plan <br />and financial management program - including a borrowing program which will identify sizing, timing <br />and financing source of required borrowing, 2) an analysis of elements of the current water and <br />wastewater rate structures not evaluated in Phase I, and 3) development of recommendations as to <br />rate structure modifications to meet the County's objectives and comply with generally accepted rate <br />making practice. <br />We will develop a five year financial management program, rate plan and rate structure <br />recommendations using interactive work sessions with County staff in which we will examine the <br />impact of alternative scenarios upon key financial indicators by use of graphical representations <br />projected on a large screen from our computer rate models which will be up and running and upon <br />which we will conduct the alternatives analyses interactively with County staff. <br />Phase II can be completed quickly. Our approach focuses concentrated attention during <br />Phase II to 1) quickly integrate County staff into the process, 2) quickly determine the overall <br />financial outlook for the Utility, and 3) determine the goals and parameters for development of <br />specific rates and charges in Phase III. <br />Phase III - Conduct a Cost of Service Analysis and Calculate Rates and Fees <br />In Phase III, we will conduct a fully allocated cost of service and rate study to properly <br />identify and allocate costs (including indirect and interdepartmental costs), conduct a bill frequency <br />analysis to derive the necessary customer and billing data for rate computations and develop specific <br />rates, charges and impact fees for each utility integrated with a detailed customer impact analysis. <br />Rates and fees will be developed in accordance with the rate structure recommendations of Phases <br />I and II and a customer impact analysis will be performed simultaneously with rate calculations, <br />allowing us to include the County staff in interactive work sessions to calibrate cost allocation and <br />rate structure variables according to customer impact. <br />As in Phase II, in these work sessions, we will conduct alternative scenario analyses <br />interactively with County staff with our rate models up and running on the computer. This allows us <br />to develop final rates and fees that generate sufficient revenues, yet are structured so as to be sensitive <br />to the County's objectives with regard to customer impact. Customer impact will be examined for <br />each utility rate and for the combined impact of all subject utilities upon customers of varying sizes <br />and with various usage profiles within customer classes. Examples of two types of customer impact <br />analysis charts are presented on the following page. <br />NOVEMBER 5, 1997 <br />-25- 0 <br />J ,. <br />
The URL can be used to link to this page
Your browser does not support the video tag.