My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/25/1997
CBCC
>
Meetings
>
1990's
>
1997
>
11/25/1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:10:20 PM
Creation date
6/17/2015 10:25:01 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
11/25/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ON MOTION by Commissioner Adams, <br />SECONDED by Commissioner Ginn, the Board <br />unanimously approved Change Order No. 3 <br />decreasing the contract price to $258,291.66 and the <br />final payment and release of retainage to Chilberg <br />Construction, Inc., as recommended by staff. <br />CHANGE ORDER IS ON FILE IN THE OFFICE <br />OF THE CLERK TO THE BOARD <br />11.G.3. DRAINAGE IMPROVEMENT PROJECT EAST OF OLD <br />DIXIE HIGHWAY, NORTH OF 8TH STREET - <br />GLENDALE TRADE CENTER (CHARLES SE LLIVANI <br />The Board reviewed a Memorandum of November 18, 1997: <br />TO: James E. Chandler, <br />County Administrator <br />FROM: James W. Davis, P.E., <br />Public Works Directo <br />SUBJECT: Drainage Improvement P ject East of Old Dixie Highway North of 8`" Street <br />DATE: November 18, 1997 <br />DESCRIPTION AND CONDITIONS <br />In the mid 1980's, the County and property owners east of Old Dixie Highway north of 8"' <br />Street cooperatively funded and constructed a drainage ditch between Old Dixie Highway <br />and the FEC Railroad to relieve flooding in the area. The constructed ditch at that time <br />took a non -straight alignment with many sharp turns to avoid creating an adverse impact <br />on developed and undeveloped parcel. In addition, some of the ditch was existing prior <br />to the mid 1980's but was not in recorded drainage easements. <br />One parcel along the ditch's alignment recently was purchased from Claude Mathis (Knight <br />and Mathis, Inc.) To Charles Sullivan, Sr.(Glendale Trade Center). A site plan has been <br />developed for the property. Mr. SullivAn has aoreed to dedicate and exchange needed <br />easements to straighten out this ditch by constructing a new ditch on the site's west <br />property line. At the south end of the site, approximately 200' of 30" pipe is needed to <br />connect the new ditch to the SuRene Mobile Home Park section of the ditch. The <br />developer and County staff are proposing to cost share in the project as follows: <br />Item County Share Developer Share <br />Purchase 200' of 30" pipe $ 3,100.00 0 <br />Install 200' of 30" pipe 0 $ 3,100.00 <br />Construct 510' of 25' 0 $ 5,000.00 <br />wide ditch <br />Sod 510' x 25' Ditch $ 1,657.50 0 <br />Dedicate additional easements <br />where needed $2,866.50 <br />$ 7,624.00 $8,100.00 <br />— <br />NOVEMBER 25, 1997 -25- BOOK F,c�: <br />
The URL can be used to link to this page
Your browser does not support the video tag.