My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/9/1997
CBCC
>
Meetings
>
1990's
>
1997
>
12/9/1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:10:20 PM
Creation date
6/17/2015 10:28:24 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
12/09/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The eastern driveway will provide access to the overall site, with primary access to the <br />convenience store/restaurant and fuel pumps. The driving aisle will loop behind the <br />convenience store/restaurant building providing access to a proposed fast food drive through <br />lane, an office building, a mini storage facility, and a car wash and vacuum stations. The <br />southernmost east/west driving aisle located between the fuel pumps and SR 60 will be <br />stubbed out to the east and west property lines to facilitate vehicular interconnection between <br />the subject site and adjacent properties. These provisions meet the county's interconnection <br />requirements (952.12). Through the PD process, the developer has agreed to grant a public <br />access easement to the county to ensure public use of the interconnections and access drives. <br />The developer has agreed to the dedication, which will be accomplished prior to or via the <br />project PD final plat. The internal traffic circulation plan has been approved by the traffic <br />engineering division. <br />9. Stormwater Management: The project's stormwater management plan has been <br />conceptually approved by the public works department, and the developer will be required <br />to obtain a Type "A" stormwater management permit prior to site plan release. There will <br />be three separate stormwater ponds on the site. Two of the ponds will be located along the <br />site's SR 60 frontage, between the proposed buildings and SR 60. Since the ponds are over <br />2' deep, the stormwater management ordinance requires that the ponds be fenced or otherwise <br />secured by a barrier. The applicant has proposed to use a combination of aluminum fence <br />and landscaping to provide a barrier; please see attachment #5. <br />10. Utilities: The project will be connected to county water and sewer. This meets both <br />concurrency and utility connection matrix requirements. These utility provisions have been <br />approved by the County's Department of Utility Services and the State Health Department. <br />11. Landscape Plan & Buffers: The landscape plan is generally in compliance with Chapter <br />926 and the SR 60 corridor plan. The landscape plan provides a Type "B" buffer along the <br />project's SR 60 frontage, which is required based on the SR 60 corridor plan requirements <br />for sites with automotive bays oriented toward SR 60. A Type "C" buffer with a 6' opaque <br />feature is proposed along the rear (north) property line, where the site abuts vacant property <br />that is zoned RM -8 (Residential Multi -Family up to 8 units/acre). <br />The applicant is proposing to satisfy the 6' opaque feature requirement with a 6' wood fence <br />along the rear (north) property line. Based on the invoked pending landscape ordinance and <br />the PD process, staff and the Planning and Zoning Commission are recommending that some <br />type of concrete wall be used to create the 6' opaque feature. Also, the Planning and Zoning <br />Commission allowed the wall to be 6' above grade at the property line rather than above the <br />grade of the proposed building, a height differential of about 2'. The Commission <br />determined that the height of the feature would be adequate due to the extensive setback of <br />the proposed building from the property line (75'). Planning staff has modified its previous <br />recommendation accordingly. In accordance with the pending ordinance, landscaping will <br />be provided on the residential (north) side as well as the commercial (south) side of the <br />wall/fence, and 50% of the shrub material normally required can be eliminated due to the <br />screening benefits of the opaque feature. <br />12. Environmental Issues: The 4.64 acre site is not subject to the native upland set-aside <br />requirement since it is under 5 acres. There are no wetlands on the site; therefore, the site <br />in not subject to any of county's environmental regulations. <br />13. Dedications & Improvements: The county comprehensive bikeway and sidewalk plan <br />requires an 8' wide concrete bike path along the site's SR 60 frontage. This improvement <br />is depicted on the plan and will need to be constructed prior to the issuance of a certificate <br />of occupancy. <br />27 <br />December 9, 1997 <br />
The URL can be used to link to this page
Your browser does not support the video tag.